1) underground hydraulic station
地下液压站
1.
Through introducing the general situation of the design and the design plan as well as the system form of the underground hydraulic station ventilation system of a CSP plant of a certain steel company, a design method and its economical significance of this sort of ventilation system is put forward in the paper.
介绍某钢厂CSP轧钢车间地下液压站通风系统的设计概况、设计方案及系统形式,提出了此类地下液压站通风系统的设计方法和经济意义。
2) underground GIS step up substation
地下GIS升压站
3) hydraulic cellar
液压系统地下室
4) underground hydropower station
地下电站
1.
Analysis on influence of flow velocity-flow regime and sedimentation on operation of underground hydropower station of Three Gorges Project;
三峡工程地下电站前流速流态和泥沙淤积对电站运行的影响分析
2.
Its underground hydropower station is located in the layered rocks in soft and hard rocks check.
水布垭工程地处灰岩狭谷河段,大坝高233 m,为目前世界上最高的面板堆石坝;地下电站位于软硬相间的层状岩体中;溢洪道最大泄洪功率3。
3.
The main powerhouse of Three Gorges underground hydropower station is with large span and thin cover, and it is rare internationally.
三峡地下电站主厂房跨度大、覆盖薄,国内外少有。
5) underground station
地下车站
1.
The analysis of smoke extraction system of public zone of underground station in the urban rail transit
城市轨道交通地下车站公共区排烟系统分析
2.
Shenzhen Futian Station on Guangzhou-Shenzhen-Hongkong passenger transport line is the first large underground station built for passenger transport in China.
广深港客运专线深圳福田站为我国第一座大型的客运专线地下车站。
3.
A lot of supporting techniques for the deep foundation pit were used in the construction of Guangzhou metro s 14 underground stations.
48km,全线共设16座车站,其中14座车站为地下车站,施工中采用了多种深基坑支护技术。
6) underground power station
地下电站
1.
Key concrete construction technology of TGP s underground power station on left bank;
三峡左岸地下电站混凝土施工关键技术
2.
Analysis on tailrace system with varying crown elevation of TGP s right bank underground power station;
三峡右岸地下电站变顶高尾水系统分析研究
3.
7 auxiliary transformer of Jingpohu Hydropower Plant underground power station in cave entrance is act as important power supply of network controlled switching station.
镜泊湖发电厂地下电站洞口#7厂用变压器作为网控开关站的重要电源,其接线方式的合理性和科学性至关重要,关系到镜泊湖地下电站的安全稳定运行。
补充资料:地下水电站
厂房设置在地下的水电站。它一般是由立体交叉的硐室群组成。其主要优点是厂房不占地面位置,与地面水工建筑物施工干扰较少,工期较短。采用这种厂房形式的首要条件是地质上能满足硐室对稳定性的要求,厂房位置要避开地质上大断裂;对地应力大的地方要考虑厂房硐室处于最有利的地应力方向,并比较各种硐室的断面形式(一般为城门洞形、椭圆形等),改善硐室的周边应力条件。硐室的跨度大小反映出开挖技术上的难度。中国鲁布革水电站地下式厂房采用水轮机平面扭转一角度的布置方式,使硐室跨度大为减小;同时对硐室采用喷锚技术,并用岩石力学和弹塑性理论、有限元法、模型试验方法等进行设计,从而降低了工程造价。
地下式水电站从枢纽布置来看,可分成两类。一类是地下式厂房位于首部枢纽。有些地下式厂房为了缩短高压引水管道,根据地质和防污条件的许可,把厂房向岸边靠近。另一类是地下式厂房位置远离首部枢纽,设在下游尾水出口的部位。这种布置大都属于长洞引水式水电站。地下式水电站特别适宜于在山区狭谷河流修建。中国早在50年代末已建成流溪河、古田一级电站等地下式水电站,60年代建成刘家峡、龚咀、白山等大型地下式水电站。其中白山水电站主厂房的硐室规模颇为庞大,其开挖尺寸为长121.5米,宽25米,高54米。
地下式水电站从枢纽布置来看,可分成两类。一类是地下式厂房位于首部枢纽。有些地下式厂房为了缩短高压引水管道,根据地质和防污条件的许可,把厂房向岸边靠近。另一类是地下式厂房位置远离首部枢纽,设在下游尾水出口的部位。这种布置大都属于长洞引水式水电站。地下式水电站特别适宜于在山区狭谷河流修建。中国早在50年代末已建成流溪河、古田一级电站等地下式水电站,60年代建成刘家峡、龚咀、白山等大型地下式水电站。其中白山水电站主厂房的硐室规模颇为庞大,其开挖尺寸为长121.5米,宽25米,高54米。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条