1) Mudanba coalfield
木担坝
1.
Based on the study of airscape unscrambling, on-the-spot survey, regional coalfield geology, the comparison of transportation, investment, and the analyzing of the main technical economic index and the decision tree of the Mutongyan coalfield and the Mudanba coalfield, the latter is selected.
在对木桶岩、木担坝两个拟选井田进行航片解译、各井田地质踏查、区域煤田地质资料研究、拟选井田的交通、运输、建井投资等对比研究基础上,采用技术经济指标对比和决策树相结合的分析方法,做出了详查井田的选点决策,将木担坝一带作为详查井田。
2) Grewia biloba var.parviflora
扁担木
1.
Anatomical and water physiological plasticity of Grewia biloba var.parviflora leaf and secondary xylem;
扁担木叶片和次生木质部解剖和水分生理特征的可塑性
3) wooden arm; wooden crossarm
木线担
4) four-pin wooden crossarm
四线木担
5) wooden cross arm
木横担
6) log crossing dam
木材过坝
1.
The planning amount of log conveyed by machine of log crossing dam will be 1 100 000 m 3.
本研究课题是根据木材过坝设施的机械过坝初步方案进行研究分析和技术论证,并建造了木材过坝联合运输机整机系统1∶5模型试验装置,进行了大比尺整机模型试验研究和各子专题试验研究,为原型机工程设计提供了可靠的科学依据。
补充资料:严木坝
严木坝
Kyuragi Dam
概 述
严木坝位于日本佐贺县东松浦郡严木町、松浦川水系(Matuuragawa)严木川上。混凝土重力坝,最大坝高117m,水库总库容0.136亿。该水库是天山纯抽水蓄能电站的下水库,电站最大装机容量60万kW。工程目的用于防洪、维持河道正常功能、居民用水、工业用水和发电。1973年开工,1986年竣工。
坝址区基岩为绿色片岩和花岗岩。
坝址控制流域面积33.7km2,水库面积42hm2。有效库容0.118亿m3,防洪库容620万m3,兴利库容560万m3,死库容180万m3。校核洪水位220.9m,设计洪水位218.0m。正常蓄水位199.1m,死水位168.1m。设计堆砂高程159.6m。
枢纽建筑物包括大坝、溢洪道和发电站。
大坝坝顶长405m,坝体积104.5万m3,坝体上游坡1∶0.05(坝踵贴块1∶0.06),下游面1∶0.72。
坝顶溢洪道设8扇高3m,宽12.5m的闸门,泄量1080m3/s。坝内2个直径2.2m的泄洪底孔各装有1扇孔口闸门,泄量为170m3/s,另有一个放水孔。