1) pre-driven roadway
预掘巷
1.
It includes two key points as follows: one is to drive a roadway in the fault before the coalface arrives, the roadway is named pre-driven roadway; the other is to dispose the rock waste of driving in entry of coalface.
该项技术的关键有二:一是在断层中预掘巷;二是矸石在井下处理。
2) gateway pre-heading in fault
断层预掘巷
3) tunneling
[英]['tʌnəlɪŋ] [美]['tʌnəlɪŋ]
巷道掘进
1.
Research on Effect of Rockmass Joints and Fissures on Blasting in Tunneling and Its Practice;
岩体节理裂隙对巷道掘进爆破影响的研究与实践
2.
Development of tunneling blasting expert system;
巷道掘进爆破专家系统研究开发
3.
Application of the technique of pentagon hollow cutting-in in tunneling;
五角空心掏槽技术在巷道掘进中的应用
4) heading excavation
煤巷掘进
1.
Hydraulic slotting technology to prevent coal and gas outburst during heading excavation;
煤巷掘进水力掏槽防治煤与瓦斯突出技术
5) rock drivage
岩巷掘进
1.
This paper analyzes on and probes into the factors influencing the speed of rock drivage such as the cyclical footage, drift forming, blasting efficiency, hole depth, and organizational management, etc.
对影响岩巷掘进速度的循环进尺、巷道成型、爆破效率、炮眼深度、组织管理等因素进行了分析探讨。
2.
At present,in the building of new shaft,rock drivage takes 40%-50% of whole project,and the construction takes 35%-50%.
目前,在新井建设中,岩巷掘进工程量一般约占总工程量的40%~50%,施工工期占35%~50%。
6) gob-side entry driving
沿空掘巷
1.
Research on surrounding rock deformation factors in gob-side entry driving of fully mechanized longwall top coal caving mining face in island seam;
孤岛综放工作面沿空掘巷围岩变形因素研究
2.
The gob-side entry driving in the fully-mechanized coal winning face can be protected successfully by using the anchored cable and rod supporting system.
采用锚杆、锚索支护系统成功地维护了综放沿空掘巷,保证了综放面顺利回采。
3.
In fouth cola mine of Hebi coal power stock company,roadway of neighbouring goaf bear a large pressure,maintenance is very difficult ,it affects safety production,in order to solve this problem,this coal mine co-operates with jiaozuo university of engiveering,combined supporting technology of gob-side entry driving have been studied through test in 2118 2614 workface tood results are gained.
鹤壁煤电股份公司四矿综放工作面相邻采空区的巷道所受压力大,维护困难,严重影响安全生产,为解决这一问题,该矿与焦作工学院合作,进行了沿空掘巷联合支护技术研究,经2118、2614综放面试验,效果良好。
补充资料:设备安装前的准备工作——设备的预装配与预调整
设备安装前的准备工作——设备的预装配与预调整![]() | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条