1)  cable reinforced roadside supporting
巷旁锚索加强支护
2)  anchorage cable reinforced support
锚索加强支护
1.
Fully utilize the intrinsic supporting system,fully utilize the loading capability of surrounding rock as the starting point,and refer to the geological condition,on the base of deeply practice、sufficiently demonstration and the intrinsic construction experience of anchorage cable,to optimize design parameters of anchorage cable reinforced supporting.
建新煤矿巷道支护时充分利用原有的支护体系,以充分调动围岩的自身承载能力为切入点,考虑矿井地质条件,在深入实践、充分论证和参考原有的锚索施工经验的基础上,对锚索加强支护参数进行了优化设计。
3)  roadside support
巷旁支护
4)  roadside supporting
巷旁支护
1.
The technology and practice of roadside supporting for gob-side entry retaining in fully-mechanized mining;
综采沿空留巷巷旁支护技术实践
2.
The technology and application of roadside supporting for gob-side entry retaining in full-mechanized mining
综采沿空留巷巷旁支护技术与应用
3.
In order to insure to apply gob-side entry retaining technique successfully,some factors that include the supporting design and construction during excavating,the selection of roadside supporting way during retaining the roadway and the reinforced supporting method during actual mining of next working face should been systematically taken into account for the roadway whic.
用沿空留巷技术保留的巷道要经历掘进和两次强烈的采动影响,对所需留巷的巷道,应该从掘进期间的支护设计与施工到留巷期间的巷旁支护方式选择,及下个工作面回采期间的加强支护均应统筹考虑,这样才能保证沿空留巷技术的成功实施,故沿空留巷技术是一项系统工程。
5)  cable supplement support
锚索补强支护
1.
This paper expounds the mechanism of crossheading support on fully mechanized face,and sums up some advanced methods and successful experiences of applying cable supplement support in the practice.
阐述了综采工作面顺槽支护机理,总结了锚索补强支护在实践中应用的先进方法和成功经验。
6)  anchor belt strengthening support
锚带加强支护