说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 理论涌水量
1)  reasonable flow of water
理论涌水量
1.
The reasonable flow of water in bore holes is estimated by mathematic analysis, and the estimated flow of water is compared with the true flow of pumping water by means of bore hole data.
运用地下水动力学原理,以数学分析的方法,对地浸采铀矿区水文地质条件进行了概括和简化;采用解析法求解的公式,对地浸采铀钻孔理论涌水量进行了预测。
2)  emergence theory
涌现理论
1.
The emergence theory belongs to the scope of complex adaptive systems theory, and has been applied in many fields to study the complex issues.
涌现理论属于复杂适应系统理论范畴,已被应用于诸多领域研究复杂性问题,其对过程演进问题具有高度解释性。
3)  water inflow
涌水量
1.
Forecasting water inflow of mine working face concerned with separated strata seeper;
离层积水存在的矿井工作面涌水量预计
2.
Chaotic time series analysis and prediction for mine water inflow;
矿井涌水量混沌时间序列分析与预测
4)  water yield
涌水量
1.
An analysis of the karst ground collapse and water yieldof the Zhongliangshan Tunnel in the Yusui Expressway;
渝遂高速公路中梁山隧道岩溶塌陷及涌水量分析
5)  discharge rate
涌水量
1.
The calculate methods comparison of the predictive of tunnel discharge rate;
隧道涌水量预测的计算方法比较
2.
Combined with project example,it researches the deep well water-jet theory,defines the number,separation and well depth of the well point canal through the discharge rate calculation,introduces the well point water-jet construction of deep well detailed,and discusses the problems existed and corresponding treatment measures in the act water-jet process,which will assure the trouble-free project.
结合具体工程实例,研究了深井井点降水理论,通过对涌水量的计算,确定了井点管的数量、间距和井深,详细地介绍了深井的井点降水施工,对实际降水过程中遇到的问题及相关处理措施进行了探讨,从而保证工程的顺利进展。
6)  discharge [英][dis'tʃɑ:dʒ]  [美][dɪs'tʃɑrdʒ]
涌水量
1.
On purpose to know the water burst quantity of coal 3 in Dongtan mine, the authors give an approximate calculation method, by changing unsteady flow model to steady flow one to calculate the steady discharge.
为了了解东滩矿3煤开采顶板的突水水量大小,采用了先将非稳定流化为稳定流计算出稳定涌水量,再根据突水点最大突水量与稳定涌水量的倍数关系,将稳定涌水量通过比拟方法换算为最大突水量的近似计算方法,同时给出了预测模型的检验结果,并对矿区3煤顶板预测突水点进行了水量预测。
2.
In Wangjiazhai Coal Mine,the discharge is mainly controlled by precipitation.
汪家寨煤矿涌水量主要受控于大气降水,为了及时预报矿井涌水量,利用矿井涌水量序列和降水量序列,建立涌水量非线性即时预报模型。
3.
It can be used to evaluate the water storage in bearing media in the tunnel project by using the discharge of the bore hole or fracture.
本文根据水力学中薄壁自由式小孔口稳定出流公式导出了一种新的计算公式 ,该公式在隧道工程中可根据炮眼或裂隙的涌水量来估算含水体的储水量 ,也可预测未来、反算前期的涌水量。
补充资料:涌触
1.涌现于心头的感触。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条