说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 封闭墙施工工艺
1)  seal-wall technology
封闭墙施工工艺
2)  sealing process
封闭工艺
3)  water seal technology
水封闭工艺
1.
The water seal technology is used to solve the problem of the collection rate of the mother liquid in situ leach mining of the rare earth mineral.
介绍了为解决离子型稀土矿用原地浸析法开采时母液收集难的问题所采取的水封闭工艺。
4)  section closed due to construction
施工封闭区段
5)  construction technique
施工工艺
1.
Construction technique and quality control of emulsified asphalt under seal coat in traveling highway in Hubei forest region;
乳化沥青下封层施工工艺与质量控制
2.
Research into construction technique of interchange engineering of the third western round-the-city highway passing through Xihu railway in Xi an;
西安市西三环穿越西户立交工程施工工艺研究
3.
Improve Construction Technique of Railway Signaling,Ensure Operation Quality of Railway Signaling System;
提高铁路信号施工工艺 确保铁路信号系统运行质量
6)  construction craft
施工工艺
1.
Controlling method of the construction craft for basic level on the cement stability fragmentary stone;
水泥稳定碎石基层的施工工艺控制方法
2.
Study of construction craft of filling pond to reinforce foundation;
堤防填塘固基施工工艺探讨
3.
The application of four sections construction craft during roadbed filling construction;
四区段施工工艺在路基填方施工中的应用
补充资料:气体绝缘金属封闭开关设备施工


气体绝缘金属封闭开关设备施工
installation of GIS

q{t一Jueyuonl一nshu fengb!k01guon shebe一sh}gong气体绝缘金属封闭开关设备施工(installa-tion of GIS)35kV及以下的GIS装里是柜式整体供货的,110kV及以上的设备是分若干隔室供货的.安装工作的要求是装里的绝缘合格,导电部分接触良好,SF。气体无泄漏,传动操作正确可靠. 安装前准备工作安装现场要做好防尘、防雨措施,保证照明和通风装里完好。检查及清理导体接触面和金属外壳,法兰接触面及0形密封圈应光滑无毛刺,用有机溶剂清洗干净。在法兰接触面上均匀涂上密封硅脂,然后把隔室连接,组装成开关装里的整体。要控制密封硅脂在空气中的暴礴时间,以防硅脂干结,降低密封效果。对SF。气体含水量进行检验,如不合格应进行处理.检查基础标高和中心线,以保证设备就位的位t正确。 本体安装将组装好的开关装里吊装就位,先将第一个间隔就位,找正找平固定好。再将相邻间隔就位、母线隔室就位、连接法兰面。再依次将各间隔就位连接、固定.要求各间隔连接处不受机械应力,以防止气体泄漏。就位固定后测试导电部件接触电阻.然后充SF。气体。充气前先按照制造厂规定的真空值和气体压力值,抽真空、充氮,要反复数次,以保证各隔室中无残留的空气和水分。然后注人经检验合格的SF‘气体.充气后检查各连接处无气体泄漏。最后进行操作机构安装、管道连接和外部电缆接线。 电气试验主要项目有:①测试开关、闸刀等部件的各特性参数;②连锁试验;③绝缘电阻测量、交流耐压试验;④验收合格后进行冲击合闸试验。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条