1) Zhenghe
正河
1.
According to analysis on ore controlling characteristics of structure and sources of metallogenic material and gold metallization, the authors think that mineralized belt is axial cleavage belt on the core of an anticline which is controlled by secondary anticlines in the Zhenghe gold deposit.
通过对正河金矿的构造控矿特征、成矿物质来源及成矿作用的讨论,认为蚀变矿化带受控于次级背斜,为背斜核部的轴面劈理化带,山阳-凤镇深大断裂是该矿床的导矿构造。
2) Zhenghe gold deposit
正河金矿
1.
The Zhenghe gold deposit is located in lower Gudaoling Formation of Devonian.
正河金矿产于中泥盆统古道岭组下段,矿体受脆- 韧性剪切带及晚期裂隙密集带控制。
2.
The Zhenghe gold deposit is controlled by Devonian Na-riched exhalation strata and the Ji.
板沙矿田的马鞍桥金矿床产于上泥盆统地层,严格受控于清水河-大黑沟脆-韧性剪切带,属后韧性剪切带蚀变岩型金矿;正河金矿床受控于中泥盆统海底喷流富钠热水沉积层位和金银沟韧-脆性剪切带,且后期北东向矿化叠加明显,属热水沉积-改造型金矿。
补充资料:《至正河防记》
元至正十一年(1351)黄河大规模堵口工程的技术总结。欧阳玄著。至正四年,黄河在白茅(今山东曹县境内)及金堤决口北流。至正十一年,贾鲁以工部尚书兼总治河防使主持堵口。四月开工,十一月堵口完成,黄河主流复行原道,东南经徐州等地入淮归海。朝廷特命翰林学士承旨欧阳玄撰制河平碑文,表扬功绩。欧阳玄向贾鲁访问堵口方略,并咨询有关人员,查阅施工档案,创作此《记》,详述施工技术和过程是本书的特点。它指出当时施工方法有三:疏(分流减涨,因势利导),浚(河槽清淤除障),塞(拦截决水从而堵口)。疏浚分四类:挖生地为新槽,避弯取直;浚故道使高低相配,有一定坡降;整治河身,使堤距宽窄适应水势;开减水河,使涨水有所分泄,减轻主槽负担。施工步骤是:疏浚决口前原道及减水河,总长280多里;修筑堤防,如北岸自白茅河口向东曾修堤254多里;先堵较小缺口107处及豁口4处,最后堵塞主要决口修筑截河大堤(即堵口大坝)长19多里;创造了用装石沉船法筑成的挑水坝(石船堤),挑溜归入主河槽,减轻决河口门流势等。这些工程实践,代表了14世纪中国水利科技成就和水平,在河工史上具有重要地位。《至正河防记》流传广泛,也造成某些讹误。《元史·河渠志》及《新元史·河渠志》均转录全文。单行本较为通行的有1936年中国水利工程学会《中国水利珍本丛书》本和同年商务印书馆《丛书集成》本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。