说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 纵水管
1)  longitudinal waterpipe
纵水管
1.
By reforming the layout of longitudinal waterpipe in pusher furnace, the billet cooling can be reduced and the heating quality improved.
介绍了对推钢式连续加热炉炉底纵水管布置的改进,减少对钢坯的冷却,改善加热质量。
2)  riser fingerboard
隔水管操纵台
3)  grade-line of tile drain
[水利]排水暗管纵坡
4)  Longitudinally Finned Cross Flow Tube Bank
纵肋管束
5)  longitudinal gradient of ditch or conduit
沟管纵坡
6)  longitudinal grooved tube
纵槽管
1.
This paper describes the research advance in enhanced condensation heat transfer on the wave shape bend surface fluted tube, vertical cosine grooved tube, V shape longitudinal grooved tube, vertical plain tube with longitudinal wire, ver.
为此 ,对波形曲面凹槽管、垂直余弦形沟槽管、V形纵槽管、垂直光管设置纵向金属丝、立式螺旋槽管和小螺旋角的内外螺旋三角翅片管在强化冷凝换热方面研究的进展作了概述 ,并介绍了制备低表面能合金材料以实现稳定滴状冷凝的冷凝换热强化新技术。
补充资料:钢筋混凝土循环水管施工


钢筋混凝土循环水管施工
reinforced concrete circulating water pipe construction

gongjln hunn一ngtu xunhuanshu一guan sh一gong钢筋混凝i循环水管施工(reinforced con-erete eireulating water pipe eonstruetion)有现浇和预制两种施工方法。现浇管在挖沟完后,在沟内分段浇筑。预制预应力管在工厂制作,再运到现场敷设。预制管工厂的设备比较简单,如工程地点离工厂较远而该种管子数t多时可将设备搬到现场制造。管子的直径可达3m甚至更大,长度一般为4m。 预制预应力钢筋棍凝土管预制,可用一阶段(展动挤压)工艺或三阶段(管芯绕丝)工艺施工。一阶段工艺系用申立式成型,用加工精密的内外钢套模组合定型,将主钢筋张拉完成后,即浇筑混凝土一次成型,经静定时间后蒸汽养护.三阶段工艺系按上法先浇制混凝土管芯,成型后再在管芯上缠绕预应力钢丝,用机械或电热法张拉,然后再喷盖水泥砂浆保护层,以防钢丝生锈,经水压试验合格后出厂使用。 数设带承插口的钢筋混凝土预制管挖沟徽设.平口对接的钥筋混凝土预制管除挖沟徽设外,还可采用顶管施工(见取水构筑物施工)。挖沟后按设计规定在沟底铺一层黄沙或石子,再用起重机械将预制管逐节吊人沟内、找正位!,在插口上套上橡胶密封圈后,往前一节的承口方向水平加力拉紧,使插口和橡胶圈同时均匀地嵌人承插口内,按此步探依次进行下一节管的安装.橡胶圈本身的直径略大于承插口间尺寸,并有规定的压缩比及防老化剂。在承擂口内侧采用钢衬圈和密封环进行环向水压试验.水压试验的标准按设计和规范要求。安装后进行回坟土,要求在两侧均匀回填分层夯实。 预应力钢筋混凝土管自重较大,在软土地区使用时要做混凝土基础。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条