1)  overhaul
大修酸洗
1.
By the dynamic corrosion test bo observe the corrosion and dirt form of picking inhibitor IS-138 and citric acid inhibitors 1# to films,and simulate the acid-washing conditions of 101-C exhaust boiler,it found out th optimum picking inhibitor formula for overhaul to reduce the costs.
通过动态腐蚀试验方法来观察缓蚀剂IS-138和柠檬酸缓蚀剂1~#对挂片的腐蚀及污垢形态,模拟101-C废热锅炉酸洗现场条件,找出缓蚀剂的适用测定条件:通过酸洗缓蚀剂配方改进试验找出适合大修酸洗的缓蚀剂,降低大修酸洗成本。
2)  overhaul
大修
1.
Application of work place tool chests to individual hydraulic prop overhauling process;
工位器具在单体液压支柱大修中的应用
2.
Management Practice of Blowing-on and Production of No.3 BF after Overhaul and Reformation at Liugang;
柳钢3号高炉大修改造开炉生产管理实践
3.
Application of Computerised Network Analysis Techniques in Overhaul of Heavy Electric-shovel;
计算机化网络技术在大型电铲大修中的应用
3)  heavy repair
大修
1.
Grey system theory based prediction of speedometer readings of automobile during heavy repair period;
基于灰色理论的汽车大修期的预测
2.
In general management of equipments the heavy repair should be replaced by the active maintenance to lower the repaired level extendedly.
在设备日常管理中应该以主动维护代替大修,尽量降低修理级别,并将设备大修及技术改造与设备更新结合起来,充分发挥设备效能,降低综合管理成本,实现企业利润最大化。
4)  overhauling
大修
1.
Examining and Repairing of 15t Double Cantilever Gantry Craneduring Overhauling Process;
15t双悬臂式龙门起重机大修中的检验与修理
2.
Monte Carlo simulation for combinatorial optimization of risk-based overhauling and improved replacement;
大修与新型更新组合优化的蒙特卡罗模拟研究
5)  major repair
大修
1.
Several key points for major repairing quality control of industrial boiler;
工业锅炉大修质量控制的几个重要环节
2.
6 BF at Jigang, with the measures of optimizing the plan and intensifying the constructing network management, the time limit for a project of major repair reconstruction is only 38 days.
济钢 6#高炉在炉底侵蚀严重、炉墙结厚的情况下 ,通过优化方案、强化施工网络管理等措施 ,使大修改造工期仅用3 8天 ;在一次开炉成功并迅速达产后 ,当月实现利用系数 3 。
3.
Various technical modification items, such as secondary mixing drum,muticyclone,preheating manner of mixture,single-roll crusher, loosener etc,in the major repair of sinter plant , Panzhihua I&S Co.
本文介绍攀钢炼铁厂1 号烧结机大修对烧结机系统进行的多项技术改造,包括:二次混合机、多管除尘器、混合料预热方式、单辊破碎机、松料器等。
6)  workover
大修
1.
Based on the development history of the sidetracking technology in China, the development trend of workover sidetracking technology in China is envisioned in light of the status quo of workover sidetracking technology.
在回顾我国大修侧钻技术发展历史的基础上 ,立足于大修侧钻技术现状 ,展望了 2 1世纪我国修井技术的发展趋