说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 政府工程
1)  government project
政府工程
1.
Study on the System of Government Project Procurement in China;
我国政府工程采购制度研究
2.
Analysis on advantage and disadvantage of qualification investigating methods for construction bidding of government project and relevant countermeasures
政府工程施工招投标中资格审查办法的析及对利弊分策
3.
To establish valid channel、improve regulation provision,investigate the bond regulation baseand multinational practice,briefly expound and compare the government project license regulation of Singapore and Hong Kong,conform the rightfulness of Chinese exploration.
为寻找有效途径、改善制度供给,考察政府工程投标资格预审的担保基础和多国惯例,简述并比较新加坡和香港的政府工程牌照制度,肯定中国实践探索的合法性。
2)  Government Engineer
政府工程师
3)  government investment projects
政府投资工程
1.
Along with the in-depth reform of investment, government investment projects management model has transformed from the gradual integration management model to the separation management models.
如何实现政府投资工程委托代建管理模式的初衷,关键在于选择优秀的项目管理公司从事代建工作。
2.
Along with the in-depth reform of investment, the government investment projects management model has gradually transformed from the gradual integration management model to the separation management functions.
由此,委托代建管理模式正式应用于政府投资工程的建设管理领域中。
4)  governmental project
政府工程项目
1.
The essay analyses the main common problems and reasons about the governmental project,and make some suggestions relative to the bid for it.
政府工程项目是建筑市场的重要组成部分,分析了政府工程项目招投标工作中常见的主要问题及产生的原因,并提出相应的对策。
5)  project invested by government
政府投资工程
1.
Using agent system,the project invested by government can be carried on and administr-ated with economy and quality responsibility,through the contractual relationship between owner and investor or business corporation of project,project managing enterprise and business corporation,contractors and using units.
采用"代建制",通过业主(投资方或项目投资法人)、项目管理企业(项目建设法人)、承建商与使用单位之间的合同关系,对政府投资工程项目建设进行全方位的建设和管理,承担工程建设的经济和质量责任,可深化政府投资项目法人责任制,从而提高政府投资工程的建设管理效率和投资效益,实现投资、质量和进度的有效控制,保证有限的资金得到最佳使用和最佳回报。
2.
In this paper the features of information asymmetry and information model under the model of management by construction agency in project invested by government are analyzed,the information asymmetry in the main bodies of construction agency in the project invested by government is studied.
论文分析了政府投资工程委托代建管理模式下信息不对称的特征及其信息模型,对政府投资工程委托代建主体信息不对称情况进行了研究,重点分析了政府委托方、使用单位和代建单位之间的信息优势与信息劣势。
6)  government-invested project
政府投资工程
1.
Based upon analysis of present situations in construction contract management of government-invested project points deserving attention in settle construction contract are pointed according to the characters of government-invested project in order to avoid economic disputes in final financial account.
通过对政府投资工程施工合同管理的现状进行分析,针对政府投资工程特点提出了工程施工合同订立前后应注意的事项,以避免工程竣工结算经济纠纷。
2.
Then based on those discussions, primary principles and objective models of the reform to government-invested project implementing and management model would be explored in detail.
首先分析了目前现行的政府投资工程管理模式及其存在的弊端,在此基础上,探讨了政府投资工程管理模式改革的基本思路及改革的目标模式。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条