1) reduction of live load
荷载折减
2) Live-load reduction
活荷载折减
3) reducing coefficient of liveload
活荷载折减系数
4) conversed load
折算荷载
1.
For the design of reinforced concrete girder-joist floor systems, the maximum mid-span bending moment of joists can usually be found from an assumed continuous beam on which conversed load is applied to take into account the torsional rigidity of girders.
设计钢筋混凝土肋梁楼盖次梁时,为求得跨中最大弯矩,通常采用折算荷载后按连续梁计算,以考虑实际结构中主梁抗扭刚度的影响。
5) buckling load
折断载荷
6) attenuation loading
衰减荷载
补充资料:减折
1.裁削,打折扣。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条