说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 混凝土工程
1)  concrete engineering
混凝土工程
1.
Brief description on the winter construction of the concrete engineering;
简述混凝土工程冬期施工
2.
Comment on construction quality control of shear wall structure concrete engineering;
谈剪力墙结构混凝土工程的施工质量控制
3.
The prevention and control of shrinkage cracks in concrete engineering;
混凝土工程收缩裂缝的预防与控制
2)  concrete project
混凝土工程
1.
Prevention of constructive quality common diseases of concrete project;
浅谈混凝土工程施工质量通病的防治
2.
Quality guarantee measures of concrete project with cast-in-site shear wall;
全现浇剪力墙混凝土工程质量保证措施
3.
Application in projects demonstrated that addition of a certain amount of UNF-2 high range water reducing agent in concrete project reveald apparent economic benefits.
工程应用表明,在混凝土工程中掺加一定量的UNF-2高效减水剂具有明显的经济效益。
3)  concrete works
混凝土工程
1.
Real-time dynamic emulation for construction of hydraulic concrete works;
水工混凝土工程施工实时动态仿真
2.
Connecting with the actual engineering,this paper introduces the construction of the frame beam with higher from-erection,large span and overweight load,and emphatically expounds the steel-pipe bent supporting system,concrete works and deflection and crack control.
结合工程实际情况,介绍了高支模、大跨度、超重荷载框架梁的施工情况,重点阐述了钢管排架支撑体系、混凝土工程以及挠度与裂缝的控制。
3.
Connecting with the construction techniques of the concrete works,this paper discusses on the problem of the quality control of the concrete works from the concrete materials quality control,mixture ratio,mixing,transporting,pouring and curing and the forms removal,etc.
结合混凝土工程的施工工艺,从混凝土材料的质量控制、配合比、拌制、输送、浇筑、养护、拆模等方面,论述了混凝土工程质量的控制问题。
4)  Concrete construction
混凝土工程
1.
The schedule of the concrete construction progress of the Permanent Ship-lock of the Three Gorges Project;
三峡永久船闸混凝土工程施工进度安排
2.
Some common quality problems often occur during concrete construction and these problems will directly influence engineering quality and structure safety.
混凝土工程施工时,经常发生一些质量通病,这些质量通病不能根除,直接影响到工程质量和结构安全,文章在分析混凝土工程质量通病产生原因的基础上,对其防治方法进行探讨。
5)  concrete work
混凝土工程
1.
This paper discusses the supervisions in the construction preparatory stage,construction stage and acceptance stage,emphatically probes into the measures adopted in the reinforced bar work and the concrete work in the construction stage,and points out the main checking contents of the supervision in the winter construction.
论述了施工准备阶段的监理、施工阶段的监理和成品验收阶段的监理,重点探讨了施工阶段的钢筋工程和混凝土工程所采取的措施,指出了监理在冬季施工期间的主要检查内容。
2.
Based on the engineering of formwork,reinforcement work and concrete work,this paper analyzed and discussed the managementmeasures of constructional safety and control points of safe techniques in order to promote the safety,efficience and continuance of construction.
本文从模板工程、钢筋工程和混凝土工程三个方面分析和讨论了现浇钢筋混凝土结构工程的施工安全管理措施和安全技术控制要点,以促进建筑业的安全、高效和可持续发展。
6)  ocean engineering concrete
海工工程混凝土
补充资料:混凝土工程施工


混凝土工程施工
concrete work construction

htjrlrl一ngtLJ 90)、gehellg shlgo,〕g混凝i工程施工(eonerete work construc-tion)按设计要求,将混凝土骨料、胶凝材料和水按适当比例配制成混凝土,修建建筑物的实施过程。通常采用以砂、石为骨料,水泥为胶凝材料的水泥混凝土。为改善混凝土的某些性能,常加人外加剂和掺合料。水电工程在修建坝、水电站厂房及其他各种水工建筑物时,广泛应用混凝土。混凝土工程的施工,需根据混凝土的品种、性能,施工对象的结构形式、受力条件和质量要求等特点,施工时的气温以及其他施工条件等,采用相应的施工方法。混凝土工程施工的基本内容一般包括:①混凝土制备。②钢筋和模板的加工制作。③工作面准备。④混凝土运输。⑤混凝土浇筑。⑥混凝土养护。⑦必要时的混凝土温度控制措施。 工作面准备浇筑混凝土前,需进行的准备工作有:①建筑物地基的清理验收。对于岩基,需清除杂物和松动岩石,冲洗干净,排除积水;对于软基,当留有地基临时保护层时,需先行清除并处理好。设有垫层的,需将垫层铺好,必要时适当浸湿。②施工设施的准备,包括平仓、振捣和缓降设备。需用浇筑平台的,要准备好平台、脚手架等。③模板、钢筋和埋件的安装。④在已浇好的混凝土上面或侧面浇筑混凝土时,需做好工作缝的处理。一般事先用压力水、风砂枪、刷毛机或人工加工成毛面,并清洗干净。 混凝土运输将混凝土拌和物从拌和地点运送到浇筑仓面的工序。 水平运输主要为解决两点之间水平距离的运输,分无轨和有轨两种方式。无轨运输主要采用自卸汽车,有时也可采用混凝土搅拌车、混凝土侧卸车或其他运输工具。有轨运输可使用标准轨距或窄轨铁路,用机车牵引装有混凝土罐的平台车或采用有轨混凝土侧卸车将混凝土从拌和系统运送到吊运点。一些混凝土坝施工时,在适当的位置和高程设有施工栈桥,机车将混凝土运到栈桥上,再用起重机吊运人仓。 垂直运输主要为解决两点之间高程差的运输,主要采用门座式、塔式或缆式起重机提升混凝土罐。采用门座式或塔式起重机浇筑混凝土坝时,常需配以栈桥。采用缆式起重机吊运混凝土时,不需栈桥,可由汽车或机车牵引混凝土罐车直接运到缆式起重机下面,由缆式起重机将混凝土罐吊运人仓。缆式起重机也可采用混凝土吊罐不摘钩型式,即由混凝土有轨或无轨侧卸车运混凝土至缆式起重机下面,直接卸人挂在缆式起重机上的混凝土吊罐内。这种运输形式由于省去了缆机摘挂钩等工序,故生产效率较高。中国二滩、隔河岩、水口等水电站即采用此种形式。 混凝土泵或带式输送机运输这两种设备均属连续输送的机械,可同时解决水平运输和垂直运输的问题。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条