1)  vertical shaft
立式轴
1.
For example of mechanical vertical kiln used in cement industry,the general four supporting projects for low speed and heavy duty vertical shaft are compared gradually,based on qualitative and quantitative analysis of vertical shaft force system.
以水泥机立窑为例,从立式轴力系的定性、定量入手,逐一比较低速重载立式轴支承的常见4种方案,得出最优的支承方案;从设计、制造、安装、使用、经济性角度分析入手,逐一比较低速重载立式轴键联接的常见4种方案,得出最优的键联接方案。
2)  footstep bearing
立式轴承
3)  vertical axial flow pump
立式轴流泵
1.
Some key techniques on inspection and maintenance process for vertical axial flow pump;
立式轴流泵维护检修中的关键技术
2.
According to the selection of pump models in the Huai-an fourth pumping station and the Huai-yin third pumping station of the eastern route of South-to-North Water Diversion, vertical axial flow pumps and bulb tubular pumps are compared and studied in the low-lift-head pumping station,and their selecting ranges are put forward on the basis of current conditions.
针对南水北调东线工程淮安四站、淮阴三站泵型比选,对低扬程泵站选用立式轴流泵和灯泡贯流泵进行了选型对比研究。
4)  vertical axial-flow pump
立式轴流泵
1.
Research on start-up transient of vertical axial-flow pump station;
大型立式轴流泵站起动过渡过程研究
2.
Numerical simulation of 3D turbulent flow in a vertical axial-flow pump system;
立式轴流泵装置的三维湍流流动数值模拟
3.
Model experiment of vertical axial-flow pump system for drainage pumping station;
排涝泵站立式轴流泵装置模型试验
5)  Large vertical axial pumps
大型立式轴流泵
6)  plummer block(bearing)
立式轴承箱组
参考词条
补充资料:立式多轴半自动车床操作规程
适用机型:
C2632·6(1A283),C2640·8,S1-219,C2650·8,1284,128Б4,1282。

一、 认真执行《金属切削机床通用操作规程》有关规定。
二、 认真执行下述有关补充规定:
(一)工作前认真做到:
1、 启动主电动机前,应先开动润滑泵,当压力继电器压力升到一个大气压,或指示灯亮时,才可起动主电动机。
2、 为保持刀具锋利,每班应更换一次刀具,工作前应将刀具换好。
(一) 工作中认真做到:
1、 不准加工余量超过规定的毛坯。
2、 工作夹紧装置手柄,不得长时间按住不放。
3、 调正机床或更换刀具时要停止主电动机,不准只脱开离合器,而主电动机仍在运转。
4、 用手摇动刀架上升时,不得把刀上升到原位(即超过原调正位置)防止挤坏机床。
5、 及时清除主轴上及环形槽内的切屑,防止切屑堆积导致冷却液渗入润滑油池中。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。