说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 排水体系
1)  drainage system
排水体系
1.
The arrangement of elevated pavement drainage system is related to the service life and performance of pavement after opening traffic.
高架路面排水体系的设置关系路面通车后的使用寿命和性能。
2)  sewer system
排水系统体制
1.
An overview of the sustainable development of Shanghai urban sewer system;
浅论上海城市排水系统体制规划的可持续性发展
3)  three-dimensional drainage system
立体排水系统
1.
Setting three-dimensional drainage system which is composed drainage culvert and horizontal, vertical and acclivitous drainage bore in loess landsliding body, is an effectual method for dropping the underground water level and improving the stability of slope, but its effection estimation is a problem.
设置由排水隧洞及水平、垂直和倾斜方向的排水孔组成的立体排水系统,是降低黄土滑坡体地下水位线,提高滑坡体稳定性的有效方法,但其效果的计算分析是一难点。
4)  drainage system
排水系统
1.
Analysis on technology and economy of coal mine drainage system;
矿山排水系统的技术经济分析
2.
Optimization of drainage system of extension in threatened mine by water;
受水患威胁矿井延深水平排水系统的优化
3.
Discussion on design-second-flow formula for drainage system in buildings;
建筑内部排水系统设计秒流量公式讨论
5)  drain system
排水系统
1.
In construction of the underground waterproofing engineering of the nuclear island of Tianwan Nuclear Power Station, engineers adopted self\|waterproof concrete structures and an overall outer\|pack waterproof coiled material layer as main waterproof measures, and used a layered drain system as secondary waterproof measures to form a compound waterproof and drain construction method.
介绍田湾核电站核岛地下防水工程采用混凝土结构自防水与全外包卷材防水层为主体,辅以层状排水系统,防疏结合的防排水作法。
2.
In spite of diffluence or confluent to life and industry drain system, they all have die sanitary facilities or the water tanks, piping system, it has important relation for ventilate system and dredge system to be designed and constructed reasonable.
不论是分流或合流的生活排水和工业废水排水系统,均有卫生设备或生产设备的受水器,管 道系统及通气管系统与清通设备四方面组成。
3.
The practice of drain system in high-rise building is described by analyzing the hydraulic of vertical drain in high-rise building The advantages of single vertical drain system in high-rise building were show
通过对建筑排水立管水力分析,阐明高层建筑排水系统的工况,指出单立管排水系统在高层建筑中的优越
6)  water drainage system
排水系统
1.
The structure principle and cold prevention,heat preservation design of the water supply system,water drainage system and frozen water drainage on high speed trains are described.
介绍了高速列车的给水系统、排水系统、冷冻排水的结构原理及防寒保温设计,指出了高速列车给排水系统的发展方向。
2.
This paper introduces water drainage system design in this interchange area combined with construction drawing design and site construction of this interchange area,which provides re.
结合互通区施工图设计和现场施工实际情况介绍互通区排水系统设计,为山区高速公路立交排水系统设计提供参考。
3.
The system was including the decision support system of the design and selection for the water drainage system,rapid automatic generation and rapid implement of the rescue water drainage emergency plan,and the on time fault diagnosis and the monitoring and control of the mine equipment.
包括排水系统设计与选型决策支持系统,抢险排水应急方案的快速自动生成、快速实施及矿用设备运行的实时故障诊断和监测。
补充资料:暗管排水
      利用地下沟(管)排除田间土壤多余水分的排水技术措施。土壤中的多余水分可以从暗管接头处或管壁滤水微孔渗入管内排走,起到控制地下水位、调节土壤水分、改善土壤理化性状的作用。暗管排水有便于田间机械化作业,节省用地和提高土地利用率的优点。但一次性投资较大,施工技术要求较高,如防沙滤层未处理好,使用过程中易淤堵失效。
  
  公元前2世纪,古罗马人就采用排水管在低洼潮湿地进行排水。近代的暗管排水技术由英国首创,继而美国、苏联、日本、荷兰、捷克斯洛伐克、波兰等国广泛采用。其中英、捷、波等国的暗管排水面积已达总排水面积的70%以上。中国暗管排水也有千年以上的历史,河南省济源县在唐代用三片瓦拼合而成的合瓦管,经修复整理后至今仍在使用,效果良好。
  
  结构形式 主要有以下4种:①排水管道。有管壁进水和接缝进水两种。常用的管材有不同形状和规格的瓦管、陶土管(管壁上釉)、水泥土管、水泥砂浆管、粗砂混凝土滤水管、塑料管,以及竹、木、砖、石管等。新型的管材以波纹塑料管为主,管壁呈瓦楞形,上有渗水槽孔,在管外包填滤料,其重量轻、运输方便、适于机械化埋设。管外的裹料和滤料有砂石料、棕皮、人造纤维布和稻壳、麦秸等。②排水暗沟。有土暗沟和装填滤料的滤水槽两种。前者需定期翻修,后者易于堵塞,使用期较短。土暗沟一般用深沟犁在田间开挖成狭沟,上盖土垡形成。滤水槽一般先开挖明槽,然后填入碎石、碎砖瓦、煤碴或树枝等材料。③鼠道。在动力牵引下由暗沟犁在地下一定深度打出排水道,用以排水,适宜在粘性土内使用。在沙性土使用需要固壁。机械作业时地面压力不宜过大,以防鼠道坍塌。④土线沟。用拖拉机牵引线沟犁,在田间划成深30~40厘米的窄缝沟。借以划破犁底层以加速地表水的入渗,使聚积在犁底层上的多余水分及时排出。
  
  暗管排水系统的规划布设 暗管排水系统由田间排水管和集水管组成。前者又称吸水管,用以直接排除土壤中多余的水,降低地下水位,调控土壤水、盐状况;后者则汇集由吸水管排除的地下水,并输送到排水骨干河沟中去。排水暗管通常布设在同一深度,按等距排列。对于透水性较差的粘性土或在上部有浅位阻水层时,暗管间距宜加密。为了增强排水效果,也可采用深暗管与浅明沟(或鼠道、土暗沟等)相结合的双层排水形式。对于侧向来水,则按截渗排水要求布设暗管。暗管埋设的深度和间距,主要根据排水标准而定。中国南方暗管埋深一般为1~1.2米,间距为8~20米;北方一般为1.5~2.3米,间距为50~200米。
  
  暗管施工与管理 早期的暗管排水施工采用人力开挖沟槽,人工埋设管道和填入裹滤料,并复填原土。随着农业机械化程度的提高,逐步采用开沟铺管机施工,开挖沟槽和铺设管道联合作业,有时还同时完成下滤料和回填土。也可用暗沟犁开挖鼠道,并可同时带入滤水管,起固壁和支撑作用,以延长使用年限。暗管的过水断面一般小于同级明沟,而管壁的阻抗系数则较大,因此,暗管的纵坡应较明沟大,通常为1/500~1/1000,以达到输水畅通和防淤目的。管道易淤塞,施工时应搞好滤水层,同时加强管道的管理和养护工作。一般是沿管道 100~200米设置一检查孔,兼作沉沙池,用以观测和调节水位,发现淤堵时用高压喷射水流分段冲洗暗管。为防止暗管出口附近的沟底和边坡遭受冲刷破坏,可用砖石料或混凝土加固基础。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条