说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 决策阶段
1)  decision-making stage
决策阶段
1.
Discussion the project cost management of building design stage and decision-making stage
对建筑项目工程决策阶段与设计阶段造价控制的探讨
2.
Because of less sources of funds for its construction and financing channels and more diffictilties, cost control project decision-making stage is particularly important.
随着我国国民经济持续快速的发展和对高等专业人才需求的增加,各高等学校的招生规模进一步扩大,各校正在或即将进行新校区建设,针对其建设资金来源及筹措渠道少、困难多的情况,在项目决策阶段的工程造价控制就显得尤为重要。
3.
Such the contents as the feasibility study and evaluation,rough estimation of preliminary design,contract price,project settling-account price,final account of project finish and so on are analyzed and discussed during the decision-making stage,design stage,preparat.
通过对建设项目投资决策阶段、设计阶段、实施准备阶段及实施阶段,对涉及工程造价控制的可行性研究估算、初步设计概算、合同价、工程结算价、竣工决算等有关内容进行了一定的分析和探讨,提出了实现建设项目工程造价有效控制的主要途径,以期对投资者控制造价能有一定的借鉴意义。
2)  decision phase
决策阶段
1.
It points out that the cost control of construction program transfixes the whole process of the program,analyses and represents how to control the projects costs in decision phase,design phase,carrying out phase and project complement phase of the program,to make investment controlled in quota effectively and increase the economical benefits of construction company.
指出建设项目的造价控制贯穿于项目的全过程,对在项目的决策阶段、设计阶段、实施阶段和竣工阶段控制工程造价进行了分析阐述,以使投资有效地控制在限额内,从而提高施工单位的经济效益。
2.
Based upon analysis of questions in engineering cost,from decision phase,design phase,macroscopic control,legal system construction,cost management reform and other aspects measures to deepen engineering cost innovation are elaborated in order to realize effective control of engineering cost and improve budgeting quality of cost.
分析了建设工程造价中存在的问题,从决策阶段、设计阶段、宏观调控及法制建设、建立约束机制、改革造价管理等方面阐述了深化工程造价改革的措施,以合理确定和有效调控建设工程造价,提高工程造价的编制水平。
3.
According to the control of engineering cost,from strengthening control and management in decision phase and design phase rational engineering control methods are proposed in order to realize maximum economic returns.
就如何进行工程造价的控制问题,从加强建设项目决策阶段的控制和加强设计阶段的造价管理两方面对合理控制工程造价的方法进行了阐述,最终达到投资效益的最大化。
3)  decision-making phase
决策阶段
1.
design phase and decision-making phase are the vital phase in construction cost administration.
决策阶段和设计阶段是建设工程全过程造价管理的两个关键阶段,分析了决策阶段和设计阶段工程造价管理的重要性和当前现状,并对如何加强这两个阶段造价管理提出了个人见解。
4)  multi-stage decision
多阶段决策
1.
Regarding multi-stage decision problems,ideas and practical examples of resolution by using shortest path algorithm are presented.
针对多阶段决策问题,给出了利用最短路径算法的求解思路和实例,即图结点表示状态、弧表示状态之间的先后关系。
2.
Using the multi-stage decision optimization method of the modi-matrix,the swing-up control of the inverted pendulum is expressed for a problem of multi-stage decision of minimum time.
利用摹矩阵的多阶段决策寻优方法,将倒立摆的摆起控制表示为一个求最短时间的多阶段决策问题。
5)  multistage decision
多阶段决策
1.
Considering the characters of the power market in China fully, this paper applies the multistage decision theory to solve the problem of bidding strategy making for the generation company in the daily spot market.
本文提出了利用多阶段决策方法来解决电厂竞标策略的选择问题,构造了竞标数学模型及其数值求解方法,以此确定最优的报价策略来实现电厂的利益最大化,并通过算例验证了这种方法的可行性与有效性。
6)  multi-stages decision
多阶段决策
1.
According to the dynamic programming principle of optimization, it converts the renewal problem to the logistics equipment into Multi-stages decision making, and builts up a dynamic programming model for logistics equipment renewal, provides theories instruction for short-term logistics equipment renewal decision, and combines a solid example to carry on analysis in detail.
本文根据动态规划的最优化原理,把物流装备更新问题转化为多阶段决策问题,并建立了进行物流装备更新的动态规划模型,给短期物流装备更新决策提供了理论指导,并结合实例进行了详细的分析。
补充资料:《帝国主义是资本主义的最高阶段》
《帝国主义是资本主义的最高阶段》

    V.I.列宁全面论述帝国主义的专著。全名《帝国主义是资本主义的最高阶段(通俗的论述)》,通常简称为《帝国主义论》。出版于 1917 年9月。早在20年代就有了中译本。修订后的中译文收入《列宁全集》第2版,第27卷。
   《帝国主义是资本主义的最高阶段》是K.马克思《资本论》的继续和发展。列宁在这部著作中,根据马克思主义的基本原理,总结了《资本论》问世后半个世纪中资本主义的发展,指明资本主义已经发展到一个新的阶段——帝国主义阶段。列宁把世界资本主义发展中的新的重大变化概括为帝国主义的 5个基本经济特征,并依次一一作了分析。在对帝国主义基本经济特征所作的分析的基础上,列宁给帝国主义下了一个科学的定义:“帝国主义是发展到垄断组织和金融资本的统治已经确立、资本输出具有突出意义、国际托拉斯开始瓜分世界、一些最大的资本主义国家已把世界全部领土瓜分完毕这一阶段的资本主义。”同时,列宁对K.考茨基的帝国主义定义以及考茨基当时大力宣扬的超帝国主义论进行了批判。列宁从垄断这个帝国主义的经济实质出发,论证了帝国主义是寄生的或腐朽的资本主义。最后,列宁揭示了帝国主义的历史地位。他在全书的结尾着重指出:“根据以上对帝国主义的经济实质的全部论述可以得出一个结论,即应当说帝国主义是过渡的资本主义,或者更确切些说,是垂死的资本主义。”序言最后以当初写作此书时不能使用的明确语言宣布:“帝国主义是无产阶级社会革命的前夜。”列宁的这个著名论断,可以看作是全书的总结论。
    
   

《帝国主义是资本主义的最高阶段》封面

《帝国主义是资本主义的最高阶段》封面


   
   这部著作是对马克思主义关于无产阶级革命的理论的重大贡献,是科学社会主义发展到列宁主义阶段的重要标志。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条