1) fault waterproof pillar
断层防水煤柱
1.
The features of fault zone rockmass engineering geological mechanics and its effect on leaving fault waterproof pillar;
断裂带岩体工程地质力学特征及其对断层防水煤柱留设的影响
2.
This paper introduces the method of stability for the design of the limit into the design of the stability of fault waterproof pillar.
将极限设计思想的可靠度方法引入到断层防水煤柱的可靠度设计中 ,提出了断层防水煤柱临界值的概念和确定原则 ,并结合实例提出了断层防水煤柱设计的可靠度方法的思路和步骤。
3.
We also studied the proper width of F_2 fault waterproof pillar compared with seepage and non-seepage conditions.
以桃园煤矿北八采区为对象,分析了采区内主要开采煤层10煤与对盘奥灰含水层的位置关系,在此基础上根据三维拉格朗日快速有限差分法,研究了在考虑渗流的情况下,断层防水煤柱的合理选择;以及对考虑渗流和不考虑渗流进行开采分析做了对比。
3) fault pillar
断层煤柱
1.
Based on the project of 2 fault pillars in the strip mining under the village in Linhuan Mine,the surface subsidence was simulated with 3DEC under the condition of fault pillar along strike.
根据临涣煤矿村庄下两个条带工作面留设断层煤柱、实施跳采的具体情况,采用3DEC三维离散元软件就走向留设的断层煤柱对地面沉陷的影响进行了模拟研究,结果表明:走向留设了断层煤柱将会使地面下沉量减小14。
4) waterproof pillar
防水煤柱
1.
On this basis,the 17116 first-thick seam extraction is successful mined with retaining 37 m waterproof pillar under increasing ceiling.
在此基础上对17116第一个厚煤层回采面成功地进行了留设37 m防水煤柱下的提高上限开采,取得了宝贵的开采经验和良好的矿井经济效益。
2.
The main target coal seam of Xieqiao Mine is directly covered with the Quaternary bottom gravels, whose impermeability affects the reasonable retainment of waterproof pillar.
第四纪底砾层直接覆盖在谢桥煤矿煤系地层之上,其隔水性能影响到防水煤柱的合理留设。
3.
In order to find the possibility and safety of coal exploitation under water with reduced waterproof pillar at upper limit,the vertical boreholes were drilled from the surface to detect overlaying rock failure.
为探求水体下采煤提高回采上限的可能性和安全性,利用地面探测钻孔进行覆岩破坏探测试验,试验表明了倾斜长壁综采条件下软弱覆岩的破坏发展高度较低,仅为常规数值的50%左右,为条件类似矿井缩小防水煤柱、提高采煤上限提供重要的参考。
5) waterproof coal pillar
防水煤柱
1.
UDEC simulation of the water-pouring probability in exploiting waterproof coal pillars under the conditions of thick loose bed and ultrathin overlying strata;
UDEC模拟厚松散层及超薄覆岩条件下开采防水煤柱覆岩突水可能性
2.
13-1 sublayer coal of the reducing waterproof coal pillars in No.
通过对潘一煤矿西二采区缩小防水煤柱块段13-1煤底分层赋存条件及其顶板岩性特征的研究,顶分层覆岩破坏规律的分析与研究,上覆松散含水层及基岩风化带的划分与评价,以及顶分层试采工作面出水及压架原因分析与研究,论证了本底分层块段缩小防水煤柱上综采的可行性。
3.
The author studies mainly on the characteristics of engineering geology about the zone of weathering overlying coal seam,the mechanism of cutting waterproof coal pillar and provides the reference for the coal mine with similar condition in cutting waterproof coal pillar.
对黄淮矿区古风化壳进行了详尽分析和简易分带,重点研究了开采煤上方风化带的工程地质特性,探讨了临界风化带开采缩小防水煤柱的机理。
6) water barrier pillars
防水煤柱
1.
Numerical simulation of influence of water barrier pillars for subsided column on rock failure in mining process;
陷落柱防水煤柱留设对围岩变形影响的数值模拟
2.
Static simulations at different time of working face with water barrier pillars are carried out with FLAC3D , pseudo-dynamic simulation for excavation process of moving forwards are made up of static simulations being arranged according to rank of moving forwards in time field.
采用FLAC3D软件进行了防水煤柱留设条件下采矿工作面推进不同时刻的静态模拟,按推进顺序在时间域上的编排即构成了推进全过程的准动态模拟,可视化的结果为采矿影响评估、工作面布置和煤柱留设等采矿决策提供了依据,模拟结果表明,应力集中系数均随推进距离增加而增加,推进距离超过一定数值后,应力集中系数趋于常数;防水煤柱对顶底板位移影响极大,煤柱留设少,底板位移大,较大的煤柱尺寸,对应较小的顶底板破坏深度和较小的应力集中系数。
补充资料:井筒煤柱开采
随着开采深度的增加,立井井筒和工业广场煤柱(见矿柱) 的压煤量越来越大。过去井筒煤柱一般留而不采;有时在矿井报废前另建提运井巷进行开采,此法不经济;或采用巷道开采方法开采,回采率极低。自50年代起发展利用本井筒开采自身保安煤柱,并保持井筒功能的新技术,首先在德国和比利时试验成功。1960年以后,在波、苏、捷等国又得到进一步发展。特别是波兰,不仅开采了被井筒穿过的煤柱,而且开采了完全位于井筒之下的煤柱;不仅开采了生产矿井的井筒煤柱,而且对在建和新建成矿井的井筒煤柱也进行了开采试验。近十多年来,中国也进行了开采井筒煤柱的试验。如淮南矿区开采了急倾斜煤层井筒及工业广场煤柱。
开采井筒煤柱时,井筒会发生下沉、偏斜、水平和垂直方向的拉伸和压缩变形,以及水平方向的位移和扭动。当井筒穿过含水地层时,如处理不当,还会发生井壁漏水现象。目前,波兰首创的"两步开采法"应用较广;第一步开采井筒周围的一小块煤层;第二步在全煤柱范围内用长工作面一次开采(见图)。方法有:①由煤柱一侧向另一侧回采;②由煤柱中心或稍偏离中心处向两侧回采;③由煤柱两侧向中心回采;④由煤柱一侧前后两个工作面跟随向另一侧回采。如井筒位于煤层一侧,可采用条带方法,并在井筒两侧进行等面积或体积的均衡开采,以减少井筒偏斜。
开采井筒煤柱前,要对井壁及井筒装备采取防护措施:①挖去穿过所采煤层内的一段井壁,砌以防护木垛;②在罐道、梯子、排水管、压风管及电缆等管线中增设伸缩接头;③为减轻井壁的垂直变形,在所采煤层上、下一定距离的井壁上,应设置木砖压缩层。井筒煤柱范围内的地面建筑物和构筑物的防护方法,见建筑物下采煤。在井筒煤柱不能开采的情况下,有的国家在新井设计中采用加固井壁及工业广场地面建筑物的方法,以缩小深井筒和大工业广场的煤柱尺寸,减少压煤量。
开采井筒煤柱时,井筒会发生下沉、偏斜、水平和垂直方向的拉伸和压缩变形,以及水平方向的位移和扭动。当井筒穿过含水地层时,如处理不当,还会发生井壁漏水现象。目前,波兰首创的"两步开采法"应用较广;第一步开采井筒周围的一小块煤层;第二步在全煤柱范围内用长工作面一次开采(见图)。方法有:①由煤柱一侧向另一侧回采;②由煤柱中心或稍偏离中心处向两侧回采;③由煤柱两侧向中心回采;④由煤柱一侧前后两个工作面跟随向另一侧回采。如井筒位于煤层一侧,可采用条带方法,并在井筒两侧进行等面积或体积的均衡开采,以减少井筒偏斜。
开采井筒煤柱前,要对井壁及井筒装备采取防护措施:①挖去穿过所采煤层内的一段井壁,砌以防护木垛;②在罐道、梯子、排水管、压风管及电缆等管线中增设伸缩接头;③为减轻井壁的垂直变形,在所采煤层上、下一定距离的井壁上,应设置木砖压缩层。井筒煤柱范围内的地面建筑物和构筑物的防护方法,见建筑物下采煤。在井筒煤柱不能开采的情况下,有的国家在新井设计中采用加固井壁及工业广场地面建筑物的方法,以缩小深井筒和大工业广场的煤柱尺寸,减少压煤量。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条