1) freezing basement rock section
冻结基岩段
1.
The article introduces a medium-deep-hole smooth-wall blasting method in freezing basement rock section of auxiliary shaft in Dingji Colliery without fracture and deformation of freezing pipe.
丁集矿副井在超深冻结565m的情况下,冻结基岩段采用中深孔光爆法施工中,连续装药,反向起爆。
2) freeze bedrock
冻结基岩
1.
Deep-hole reduction flush light demolish driving in main and auxiliary shaft freeze bedrock of Chaoyang Coal Mine and the steel form cast-in-place wall of a well design and construction;
朝阳矿主副井冻结基岩段深孔减冲光爆法掘进和整体钢模板砌壁设计与施工
4) freeze shaft wall
冻结段
1.
3 Coal Mine,analyes its reason and puts forward some suggestions for the structure of freeze shaft wall.
介绍了东荣三矿主井、副井、东风井三个井筒冻结段井壁的施工及破坏情况,并针对破坏的原因进行了分析,同时对冻结段的井壁结构型式提出了建议。
5) freezing section
冻结段
1.
Safe blast process technique for shaft freezing section;
立井冻结段爆破施工安全技术
6) two-period freezing
两段冻结
1.
Based on the results obtained from a computer simulation program and a previous published paper, industrial experiments for the new two-period freezing technique were conducted in a food freezing plant using two-stage integral compressors.
根据以往的计算机模拟结果 ,对两段冻结新工艺进行了工业规模的对照实验。
补充资料:十报恩 赠段先生 折段字起