1) Casting work plan
铸造作业计划
2) casting plan
铸造计划
3) foundry work
铸造作业
1.
Objective Research element composition of producing power in foundry work and quarry work.
调查研究某铸造作业和采石作业生产性粉尘成分的元素含量。
4) Operatlon programe for turning over cast steel parts to storage
铸钢缴库作业计划
5) Scheduling
[英]['skedʒul] [美]['skɛdʒʊl]
作业计划
1.
Research on Scheduling of MES Oriented to Multi-varieties and Small-batch Production;
面向多品种小批量生产的MES中作业计划的研究
2.
Scheduling is a very important job, it has proposed a kind of algorithm for small-batch job shop through detailed description.
作业计划的制定是一项非常重要的工作,通过对作业计划问题的详尽描述,提出了一种用于小批量生产的调度算法。
3.
A new general distributed multi-agent production scheduling system was introduced, in which each machine, job and control center had its own scheduling agent.
提出了一种新的分布式多Agent通用作业计划编制体系。
6) production planning
作业计划
1.
Research on production planning and scheduling for semi-process industry;
半流程型企业的生产作业计划制定与调度研究
2.
Using for reference line balancing and the theory of constraints,this paper presents a throughput rates based production planning and control method for job-shop plants,and a dispatching policy named throughput-balancing rule(TBR).
借鉴均衡生产思想以及约束理论,提出基于产出速度的Job-shop型企业生产作业计划与控制方法。
3.
At present, the research on the production planning of steelmaking-continuous casting just considers the full ladle transportation, however, in the production process, the empty ladle transportation can affect the full ladle transportation directly.
目前对炼钢连铸生产作业计划的研究普遍只考虑满包转运阶段。
补充资料:施工作业计划
施工企业统一计划体系中的实施性计划。它把施工企业的施工计划任务、工程的施工进度计划和施工现场具体情况结合起来使之彼此协调,以明确的任务直接下达给执行者,因而是基层施工单位进行施工的直接依据。
施工作业计划分月施工作业计划和旬施工作业计划。其内容一般由三部分组成:①本月(旬)应完成的施工任务。一般以施工进度计划形式表示,确定计划期内应完成的工程项目和实物工程量。②完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量。③提高劳动生产率的措施和节约措施。
施工作业计划分月施工作业计划和旬施工作业计划。其内容一般由三部分组成:①本月(旬)应完成的施工任务。一般以施工进度计划形式表示,确定计划期内应完成的工程项目和实物工程量。②完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量。③提高劳动生产率的措施和节约措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条