1) underground mine
井工矿
1.
Water filling sources of underground mine in Pingshuo mining area have Quaternary pore water,surface water,Permo-Carboniferous sandstone fissure water and Ordovician limestone karstic fissure water.
平朔矿区井工矿井的充水水源有第四系孔隙水及地表水、石炭—二叠系砂岩裂隙水、奥陶系灰岩岩溶裂隙水。
2) No.3 underground coalmine
三号井工矿
1.
During the Pingshuo Coal Company Antaibu No.
平朔公司安太堡三号井工矿2007年3月在首采工作面辅运顺槽掘进时,迎头冒顶突水,初期突水量达6000~8 000m3/d,将1 289。
3) production
井工矿生产能力
1.
In this paper,the partial parameter of the hoisting system,drainage system,ventilation system,feed system of the check standard of the coal mine production are optimized and qualified according to the open problem of the production check in the subterranean coal mine at the present tine.
论文结合目前井工矿生产能力核定工作中存在的问题,对生产能力核定标准中的提升系统、排水系统、通风系统和供电系统的部分参数进一步优化和限定,有效地杜绝了核定中弄虚作假的机会,提高了生产能力核定结果的科学性和准确性。
4) Anjialing underground coal mine
安家岭井工矿
5) mine
井工
1.
The numerical simulation study on the reasonable distance between the open pit slope and mine;
露天-井工联采边坡井工与边坡合理位置的数值模拟研究
6) completion technique
完井工艺
1.
The three series of completion techniques(conventional perforation,TCP and new completion) are formed including fourteen technologies,which are adaptable to different geologic settings and hole conditions.
综述了大庆油田目前完井工艺技术现状。
参考词条
补充资料:白银有色金属公司深部铜矿主井和副井
白银有色金属公司深部铜矿主井和副井
白银有色金属公司深部铜矿主井和副井
说明:补充资料仅用于学习参考,请勿用于其它任何用途。