1) peak particle velocity
质点峰值震动速度
2) Peak Particle Velocity
质点峰值振动速度
1.
It is found that the key to ensure the safety of the rock-anchored beam under blasting vibration is to prevent the cracking of the bonding interface between the beam and the vertical rock wall,and to control the horizontal peak particle velocity,which is vertical to the side wall.
利用动力有限元数值模拟,研究爆破震动荷载作用下岩锚梁的动态响应特性,研究结果表明爆破震动作用下保证岩锚梁的安全关键在于防止岩锚梁与岩台黏结面被拉裂,应严格控制岩锚梁水平向质点峰值振动速度。
2.
Basen on the criteria of the peak particle velocity(PPV) for blast-induced damage,the design approach for excavation blasting near contour of rock slope is discussed.
基于岩石爆破损伤影响范围控制的质点峰值振动速度判据,就临近岩石边坡开挖轮廓面的爆破开挖设计方法进行了探讨。
3) Peak velocity of particle vibration(PPV)
质点峰值振动速度(PPV)
4) safe peak particle velocity
安全质点峰值振动速度
5) peak particle velocity
峰值质点速度
1.
The maximum peak particle velocity(PPV) of rock in different localities was tested.
采用速度传感器测定多采空区下中深孔爆破强制崩矿产生的地震效应,分析同段雷管起爆的药量、空区状况及介质所处位置与主要爆破自由面的空间关系,对介质峰值质点速度(PPV)产生的影响。
6) PeakParticle Velocity
点峰值振动速度
补充资料:240震动机操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条