说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 超载
1)  overload [英][,əʊvə'ləʊd]  [美][,ovɚ'lod]
超载
1.
Stress analysis of asphalt pavement under overload;
超载作用下沥青路面的受力特性分析
2.
Destroy principle and economy loss evaluation of overload vehicles on asphalt concrete pavement;
超载对沥青砼路面破坏机理及经济损失评价
3.
Countermeasures and actuality ainalysis of highway damage with overloading;
超载对路面破坏现状分析及对策
2)  Overloading [英]['əuvə'ləud]  [美]['ovɚ'lod]
超载
1.
The Inadaptability Analysis of Overloading Traffic With The Level of Highway Engineering Technology;
超载与我国现有公路工程技术水平的不适应性分析
2.
The Impact of Overloading on the Cement Concrete Pavement;
汽车超载对水泥混凝土路面的影响
3.
Economic Evaluation Model for Overloading Management Based on Pavement Reliability;
基于路面可靠度的高速公路超载运输管理经济评价模型
3)  surcharge [英]['sɜ:tʃɑ:dʒ]  [美]['sɝ'tʃɑrdʒ]
超载
1.
Settlement rate method for determining surcharge removal time for embankment on soft ground;
公路软基超载预压卸荷时间确定的沉降速率法研究
2.
Three-dimensional nonlinear elastic finite element method had been developed to study the bending behavior of the passive row piles subjected to surcharge nearby.
利用三维非线性弹性有限元方法,研究了承受邻近地面超载作用时被动排桩的弯曲性状,也研究了排桩间距变化、地基软弱下卧层以及超载与排桩之间的距离对桩身弯曲性状的影响,揭示了邻近超载作用下被动排桩桩身弯矩和挠度的变化规律。
3.
For surcharge and undercharge conditions,the equation between final settlement and filling height should.
工后沉降法中最终沉降应是设计荷载——等载预压下所对应的最终沉降,对于超载预压、欠载预压,应根据监测资料确定沉降与填土高度的关系,从而根据超载预压、欠载预压监测资料推算得到等载预压对应的最终沉降量。
4)  over loading
超载
1.
Damage evaluate and the method of diagnose study of great highway bridge structure by over loading;
超载对大型公路桥梁结构的损伤评估及诊断方法研究
2.
Stress response of asphalt pavement caused by over loading under non-uniform distributed tire pressure;
考虑非均布轮载效应时超载对沥青路面结构的力学影响
3.
The over loading of vehicle bring on damage of the road surface, so it is also calculated.
针对沥青路面特点,考虑超载的影响,借助有限元分析软件对车辆周期载荷作用下的路面的各种力学响应进行了数值模拟,以及为沥青路面设计、施工、养护、改建及公路法规的制定提供参考。
5)  overfreight [英]['əuvə'freit]  [美]['ovɚ'fret]
超载
1.
Overfreight is byproduct of transportation industry.
超载是交通运输业的不良产物,越来越多的交通运输者为了追求单程最高利益,不惜超载超限运输,不仅对高速公路造成了破坏,损坏了机动车自身的安全性能,而且极易引发恶性交通事故,造成人民生命、财产的损失。
2.
Driven by economy benefit,the loading of overfreight vehicles exceeds the bearable loading of highway and bridge seriously,which makes the pavement damage,the bridge rupture,and the natural service age shorten and have to be repaired.
由于受经济利益的驱动,超限超载车辆的荷载远远超过了公路和桥梁的设计承受荷载,致使路面损坏、桥梁断裂,正常使用年限大大缩短,不得不提前进行大中修。
6)  over load
超载
1.
The paper introduced the Asphalt Pavement track test and analyzed over load and high temperature s impact on dynamic stability in track test.
采用车辙试验检验沥青路面抗车辙能力的方法,介绍了沥青混和料车辙试验的试验过程,并分析了高温和超载对动稳定度的影响,最后对减小车辙病害提出了建议。
2.
The paper introduced the total thickness track test and analyzed over load and over high temperature s impact on dynamic stability in track test.
提出了采用全厚度车辙试验检验沥青路面抗车辙能力的思路 ,介绍了全厚度车辙试验的试验过程 ,并分析了超载和超高温对动稳定度的影响 ,最后对减小车辙病害提出了几点建
补充资料:超载
1.交通运输工具的装载量超过其规定标准。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条