1) vibration interval
震动间隔
2) seismic activity interval
地震活动间隔时间
3) active interval of earthquake
地震活动时间间隔
4) story isolation
层间隔震
1.
Research on working mechanism of story isolation structure;
层间隔震结构工作机理研究
2.
Theoretical study on story isolation system
层间隔震体系的理论研究
5) interlayer seismic isolation
层间隔震
1.
simplified analysis on calculation model of interlayer seismic isolation;
层间隔震结构计算模型的简化分
2.
Here the application of the interlayer seismic isolation in some engineering is introduced,and the finite element program—ETABS is used for making out the dynamic nonlinear time-history analysis.
层间隔震是一种新的隔震设计思想,它将隔震层设置在建筑物某层柱子和楼板之间进行结构的地震反应控制。
3.
This paper describes the working characteristic of interlayer seismic isolation.
简述了层间隔震的工作特点及其与调谐质量阻尼器(TMD)2种控制方法的优缺点,建立了层间隔震与TMD混合控制体系的动力模型,对控制参数进行了优化分析,然后以一个21层框架剪立墙结构为例,利用ANSYS软件分析了此种混合控制的减震效果。
6) interlayer seismic isolation system
层间隔震
1.
The vibration reduction mechanism and dynamic characteristics of the interlayer seismic isolation system and the difference between such system and the base isolation system are introduced.
简要阐述了层间隔震体系的隔震原理、动力性能等及其与一般的基础隔震的区别,然后以框架剪力墙结构为例,利用ANSYS软件分析了层间隔震的减震效果;说明了层间隔震结构对于大震具有比较明显的减震效果,并且施工方便,是一种具有发展前途的减震体系。
补充资料:240震动机操作规程
1、遵守《铸造设备通用操作规程》有关规定。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
2、检查管路系统有天漏气情况和下气缸的升降情况,确定一切正常后,方可进行生产。
3、工作前,先启动通风机和运输皮带,然后再动设备。
4、夹持模组时,一定要对正上下顶杆中心,以免在震动中,模组脱落或飞出。
5、模组夹持好之后,一定要关门震动,不许开门工作。
6、用天车直吊模组时,不许碰撞伐门手柄。
7、发现手柄失灵或的手柄不能移至需要位置时,应先进行检查,不得强力扳动。
8、工作后,先停设备,再停运输皮带和通风机。
9、工作后给震动气缸与夹持气缸加20号机械油,以防气缸与活塞生诱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条