说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 人工措施
1)  artificial measures
人工措施
1.
Effect of different artificial measures on restoration and reconstruction of desert ecosystem at preliminary stage;
不同人工措施对沙质荒漠生态恢复与重建初期效应的影响
2)  artificial promoting measures
人工促进措施
3)  Construction measure
施工措施
1.
Design plan of water-conveying tunnel in high-side pad road foundation and its construction measures
高垫方路基内输水隧洞的设计方案和施工措施
2.
Due to the proper construction measures and enhancing site administration,glue-belt conveyer stone door and track conveyance stone door have successfully passed the Dazhai Landslide Area,which guarantees the quality and progress of the project.
发耳煤业公司一井区的胶带输送机石门、轨道运输石门在施工中由于采取正确的施工措施和加强现场管理,顺利通过了大寨滑坡体区段,也保证了工程质量和进度。
3.
Because the bridge is asymmetric,this paper proposed some suggestions about construction measures for some important components and processes to ensure the bridge could be constructed safely.
针对桥的不对称特性,对主要构件的施工和重要施工步骤提出了施工措施建议,保证了安全顺利地完成桥梁施工。
4)  construction measures
施工措施
1.
The influences of later poured band on structure and its construction measures;
后浇带对结构的影响及其施工措施
2.
The article analyzes the characters of equipment fixing projects in large or middle sewage treatment plants and poses a series of construction measures of equipment fixing projects combining with the practical projects,so that it is refered to by the construction enterprises.
分析大中城市污水处理厂设备安装工程的特点,结合实际工程经验提出设备安装工程的一系列施工措施。
3.
From the necessity of management on the expense that is spent on safe and civilized construction measures, the essay analyzes the management state, failures in the management and the reasons and finally puts forward the correlated countermeasures and suggestions.
文章从建设工程安全文明施工措施费用管理的必要性入手,分析了当前建设市场建设工程安全文明措施费用管理现状及其存在的问题和原因,并就切实有效加强建设工程安全文明措施费用管理提出相应的对策和建议。
5)  construction method
施工措施
1.
Then take the corresponding construction method to get efficiency.
从事故原因调查分析入手,提出了改造报废厂房的多种加固改造方案,确定了预制桩的基石出处埋方案,并阐述了施工措施,成功地完成了厂房的加固改造。
2.
The problems of the tunneling machine in construction and improvement in construction method are summarized.
作者介绍了引大入秦工程中隧洞掘进机的主要组成部份,后配套设施,辅助设施以及施工组织情况,并对该掘进机在施工过程中的问题及施工措施的改进作了小结。
3.
The paper introduces closing body design, temperature control design, and responding construction methods.
本文主要介绍导流隧洞堵体设计、温控设计及相应的施工措施。
6)  human rights measures
人权措施
1.
American measures have caused adversary effects on our exports to America,which should be effectively coped with if we make sure that we innovate our idea of new foreign trade law,making additional human rights measures and modestly using this kind of measures.
美国根据国内贸易法采取的人权措施具有单边性、任意性并且暴露了此类贸易限制或禁止措施的霸权主义本质。
补充资料:不合格品纠正措施(见纠正措施)


不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions

bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条