1) Construction Equipment
施工装备
1.
Base on the review of the technology development of borehole construction for mine gas drainage in China underground coal mines, the paper summarized the present status and appropriate conditions of the borehole construction equipment for mine gas drainage in coal mines and individually introduced the principle, technical features and applications of several borehole construction technologies.
在回顾我国煤矿井下瓦斯抽放钻孔施工技术发展的基础上,总结了现阶段煤矿井下瓦斯抽放钻孔施工装备的现状及适用条件,分别介绍了各种钻孔施工技术的原理、技术特点及应用情况,分析总结了我国煤矿井下瓦斯抽放钻孔施工装备和技术发展所面临的问题是如何实现水平长钻孔的准确定向,进一步延长钻孔的有效抽放段距离和有效抽采时间;如何提高松软突出煤层钻孔深度和有效成孔率,并提出未来发展趋势是履带一体化和随钻测量定向钻进技术和装备;松软突出煤层的瓦斯抽采关键技术及其装备;研制开发安全、可靠、有效的远程控制钻机及绿色产品设计思想。
2.
The paper introduced BJS-L50 construction equipment of deep mixing continuous underground wall on its structural features,technical specifications and performance parameters,analyzed the economical and social benefits with engineering cases.
论述了B JS-L50型深层搅拌地下连续墙施工装备结构特点、技术特性及性能参数,结合工程实践对其进行经济效益和社会效益分析,从而说明该装备较适合中国国情,易于推广,应用前景广阔。
3) construction machinary equipment
施工机械装备
4) construction equipment
建设[施工]装备
5) Slab Track Construction Equipment
无碴轨道施工装备
1.
Research on Project Management of Slab Track Construction Equipment;
无碴轨道施工装备研发项目管理研究
6) construction preparation
施工准备
1.
Technical measures for shaft construction preparation on deep waste rock accumulations;
深厚废石堆积层上进行竖井施工准备技术措施
2.
This article summarized the survey supervision at the stage of construction preparation, including the establishment of supervision planning and detailing, repetition measurement control point, repetition measurement of king-pile coordinates and elevation, increasing control points, lofting and examination of the cubic meter of earth and stone quantity.
对公路桥梁工程施工准备阶段的测量监理工作,即编制监理规划及细则、交接桩、控制点、中桩坐标及标高的复测、加密控制点、施工放样及土石方量的审核等进行了归纳总结。
3.
The construction preparation of engineering projects will guarantee the implementation of construction and installation.
建设工程项目施工准备是土建施工和设备安装得以顺利进行的基本保证,做好施工项目的施工准备工作,对于发挥企业优势、合理配置资源、加速施工速度、提高工程质量、降低工程成本、保证工程合同履约和增加企业经济效益,都有极为重要作用。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条