说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预警指标
1)  early warning index
预警指标
1.
Based on the research of influence concrete gravity dam security factor and the early warning index system,introduced block-based theory of discontinuous deformation analysis,considered the whole stability against sliding of the dam body and the dam base,used the intensity.
在研究影响混凝土重力坝安全的因素和预警指标体系的基础上,引入基于块体理论的非连续变形分析,考虑坝体和坝基整体抗滑稳定,采用强度折减系数法分析了三峡大坝左岸厂房3#坝段的整体抗滑稳定性,得到了安全系数与大坝位移之间的内在联系。
2.
The early warning index system of turnover according to the characteristic of IT project members is designed.
首先根据IT项目成员的特点设计了离职预警指标体系,然后通过对统计数据的分析和拟合,得出了IT项目成员离职预警模型,并对模型及其因素进行了显著性检验;最后,对计算结果进行了分析并得出结论。
3.
Based on the analysis of the financial risks in the higher learning institutions run in the red,the article put forward an early warning index system and explored the mechanisms of monitoring the early warning on the solvent risks of the higher learning institutions.
本文在分析高校负债办学财务风险的基础上,提出了高校偿债风险的预警指标体系,并对高校偿债风险的预警监控机制作了探讨。
2)  warning index
预警指标
1.
In order to ensure petroleum enterprises for sustainable development the paper analyzes the characteristics of producing management of petroleum enterprises,and builds warning index system.
为保证石油企业的持续稳定发展,本文根据石油企业的生产经营特点,建立了石油企业生产经营系统监测预警指标体系,在此基础上应用加权平均法构建了石油企业生产经营综合评价预警模型,并以胜利油田为例加以应用分析。
2.
According to the results of the experiments, put forward warning index and the threshold value of warning of soil enzyme for heavy metals Cu~(2+), Cr~(3+), Pb~(2+) pollution of Shandong brown soil.
本文研究了重金属Cu2+、Cr3+、Pb2+污染对山东棕壤土壤过氧化氢酶、脲酶、磷酸酶、蔗糖酶活性的效应;提出了山东棕壤重金属Cu2+、Cr3+、Pb2+污染,土壤酶的预警指标和预警阈值。
3.
Based on the analysis of the relation between the regional precipitation and the water level of Wangjiaba station, the warning index of flood causal rainstorm in Huaihe river basin is determined.
本文通过对1950~2000年的个例分析,总结了淮河流域致洪暴雨的天气学特征和判别指标;根据区域降水量与王家坝站的水位分析,确定了淮河流域致洪暴雨的预警指标
3)  early-warning index
预警指标
1.
Monitoring early-warning index designs for investment risk at infrastructure project;
基础设施项目投资风险预警指标设计
4)  alarming index
预警指标
1.
Based on present study,this author improves the alarming index system of credit risk and establishes an alarming index model of credit risk based on AHP method,providing decision-making support for banks to efficiently manage credit risk.
本文在现有研究基础上,运用AHP法进一步完善信贷风险预警分类指标体系,计算出预警指标体系各因素权重以及综合预警指数,从而得到信贷风险等级及预警状态,为银行进行有效信贷风险管理提供更为科学的决策支持。
2.
Damage alarming index is key in the bridge alarming system,whose working energy is decided by the effective of damage alarming.
损伤预警指标是桥梁预警系统研究中的关键内容,损伤预警的效果决定着整个系统的工作性能。
5)  forewarning index
预警指标
1.
Establishing forewarning index evaluation model for the public relations of the staff in industries based on factor analysis method;
用因子分析法构建企业员工关系公关预警指标评价模型
6)  indicators' early warning
指标预警
补充资料:预警指标
预警指标是用于对宏观经济运行的监测,并根据指标数据对可能出现的总量
失衡、结构性矛盾、突变事件等异常情况进行预报的指标,如国民生产总值和国民
收入增长率、固定资产投资增长率、通货膨胀率、失业率等。这类指标通常都涉及
面广、敏感性强,对国民经济发展和社会稳定具有关键影响。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条