3) dike reinforcing-fee method
堤防加固费用法
1.
Based on the characteristics of reservoir s mud-control,this paper advances three methods for calculating the benefit of reservoir s mud-control such as the reservoir capacity loss method,the flood-disaster loss method and the dike reinforcing-fee method.
根据水库拦泥特征,提出了库容损失法、洪灾损失法、堤防加固费用法等3种水库拦泥效益的计算方法。
5) Strengthening and regulation of Dyke
堤防加固整治
6) embankment foundation consolidation and seepage prevention
堤基加固防渗
补充资料:不堤防
1.犹言不料。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条