说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> Tennant法改进
1)  improvement Tennant method
Tennant法改进
2)  improved Tennant method
改进的Tennant法
1.
The ecological flow processes at the three representative stations were calculated with historical runoff methods: the monthly even frequency computation method and the improved Tennant method.
选取黄河下游地区花园口、高村、利津3个代表站的实测月径流量系列,利用逐月均频率计算法和改进的Tennant法2种历史流量计算方法分别计算了3个代表站的生态径流过程。
3)  Tennant method
Tennant法
1.
In order to make Tennant method adapt to calculate instream water requirement of South-North Water Transfer Scheme via the Western Route(SNWTSWR),calculative criterion of Tennant was modified.
为了使Tennant法更适合计算南水北调西线河道内生态需水量,对其计算标准进行了修正。
2.
By choosing Yichang station and Hankou station at the middle and lower reaches of the Yangtze River as the hydrological control transects,the calculating result is evaluated by Tennant method.
以长江中下游河道计算为例,分别选取长江中下游的宜昌、汉口水文站作为控制断面,对长江中下游河道最小生态流量进行了研究,并利用Tennant法对计算结果进行了分析评价。
4)  extended forward step method
改进前进法
1.
A new numerical method, namely extended forward step method, was presented for the hydraulic analysis of the pipeline sprinkler irrigation system.
根据前进法的基本思路,提出了管道式喷灌系统水力解析新方法——改进前进法(EFSM)。
5)  method improvement
方法改进
6)  improved method
方法改进
补充资料:超改进控制加权形心单纯形法
分子式:
CAS号:

性质:结合了超改进单纯形法与控制形心单纯形法两者的优点而产生的一种单纯形优化方法。由除响应值最差的顶点w以外的其余各单纯形顶点的响应值计算加权形心点pw,引入控制参数γ调节加权形心点的位置,确定w的反射点pγ,以保证单纯形沿逼近梯度的方向推移。在确定的推移方向上,根据顶点w、加权形心点pw。和反射点pγ的响应值用二次曲线拟合求导,决定单纯形的新顶点,以保证新顶点在该推移方向上是最优的,从而加快了优化速度。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条