说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 盲数
1)  blind number
盲数
1.
A mathematical model for potential ecological risk assessment of sediments based on blind number theory;
基于盲数的水体沉积物潜在生态风险评价方法
2.
Study on the blind number recognition of the calculation of roof pressure;
顶板压力计算的盲数辨识研究
3.
Optimization method and computer program based on the blind number theory;
基于盲数理论的最优化方法与程序实现
2)  unascertained number
盲数
1.
The weighted unascertained number regressive model was proposed to improve the original model.
为克服传统客运量回归预算法中测忽视历史数据对未来预测的影响,以及无法处理影响客运量预测不确定因素的问题,提出了采用加权盲数回归方法进行公路客运量预测。
2.
This paper applies the unascertained number theory to modelli.
此文应用盲数理论对含有大量不确定性信息的负荷预测进行建模,把影响电力负荷变化的不确定性信息描述为指标因素,比较各个因素对负荷变化区间的影响并且用数值来定量表征,得到变化区间在各因素指标下的相对评价向量,构造出判断矩阵。
3.
In order to deal with unascertained information,an innovative method called unascertained number regressive is introduced to the forecasting of port handling capacity to prevent appearing distinct errors derived from lots of unascertained information.
针对港口吞吐量预测中由于大量不确定性信息所导致预测结果中存在显著误差,可引入新的回归预测方法——盲数理论来对不确定性信息进行处理,实例表明该方法可使预测结果比较合理、可靠,避免传统预测方法中不确定性信息所导致的较大误差。
3)  number blindness
数盲
4)  blind number theory
盲数理论
1.
Application of blind number theory in calculating water environmental carrying capacity of lakes;
盲数理论在湖泊水环境容量计算中的应用
2.
Quantitative analysis of ecological water requirement for reservoirs based on blind number theory;
基于盲数理论的水库生态需水量化分析
3.
The blind number theory in unascertained mathematics is used to calculate the environmental capacity,according to the characteristics of several kinds of uncertainties coexisting in water environmental system.
根据南淝河的水文资料,从水环境系统多种不确定性共存的角度,运用未确知数学中有关盲数理论对南淝河主要污染物COD、NH3-N进行环境容量的计算。
5)  blind model
盲数模型
1.
Aimed at the uncertainty of each parameter in the lake total phosphorus loading model and the dirty discharge amount in the total phosphorus planning, utilizing blind theory to combine the Dillon model, blind model (BM) and cost-benefit analysis (CBA) model, the optimal model of D-BM of lake total phosphorus planning was established.
针对湖泊总磷负荷模型中各参数及总磷规划中排污量的不确定性,运用盲数理论,将Dillon模型、盲数模型和费用效益分析模型结合,建立了湖泊总磷规划D-BM优化模型。
6)  blind drilled parameter
盲孔参数
1.
It also discusses the influence of the cover material of blind drilled press roll on the blind drilled parameter and puts forward the suggestion on the technology improvement for the blind drilled parameter design.
讨论了盲孔压辊覆面层材料对盲孔参数的影响。
补充资料:盲盲
1.谓茫茫无所见。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条