1) Top and Bottom Combined Blown Converter
顶底复吹转炉
1.
Optimal Control Technique for Bottom Blowing Flow Rate of Top and Bottom Combined Blown Converter;
顶底复吹转炉底吹流量优化控制技术
2.
The initial exploratory to prolong the life of converter by slag spitting protection for 48-ton top and bottom combined blown converter is introduced, a proper result got.
介绍了邢钢对48 t顶底复吹转炉通过采用溅渣护炉技术,提高复吹转炉炉龄的初步探索,取得了一定效果。
2) top-bottom combined blowing converter
顶底复吹转炉
1.
Analysis on metallurgical effect of low carbon steel in No.1 top-bottom combined blowing converter in Liangang;
涟钢1号顶底复吹转炉低碳钢冶金效果分析
3) 100 t Top and Bottom Combined Blown Converter
100t顶底复吹转炉
4) 180 t Top-Bottom Combined Blow Converter
180t顶底复吹转炉
5) top and bottom blown converter
顶底吹转炉
6) Top-bottom-side blown converter
顶底侧吹转炉
补充资料:顶底复吹转炉的炉底(正在倾炉出钢)(宝钢)
顶底复吹转炉的炉底(正在倾炉出钢)(宝钢)
顶底复吹转炉的炉底(正在倾炉出钢)(宝钢)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条