Also discussed are the current situation of technical development and technical features of the world first-class ERW welded pipe mills,based on which the technical characteristics of the said Baosteel mill are compared and discussed,focusing on the advantages of the mill.
介绍了宝钢ERW610焊管机组的建设情况及其产品定位;分析了世界先进ERW焊管机组的技术发展现状及世界一流ERW焊管机组的技术特征,并对比分析了宝钢ERW610焊管机组的技术特点,阐述了宝钢ERW610焊管机组的技术先进之处。
3)  unit commitment
机组组合
1.
Dynamic double-population particle swarm optimization algorithm for power system unit commitment;
电力系统机组组合问题的动态双种群粒子群算法
2.
An improved immune algorithm for unit commitment;
一种求解机组组合问题的改进免疫算法
3.
Modified particle swarm optimization for unit commitment;
改进微粒群算法在机组组合问题中的应用
4)  unit combination
机组组合
1.
Study on solving the time restraint problem of hydroelectric generating unit combination using Controlled Colored Petri Net;
用受控有色Petri网解决水力机组组合中时间约束问题的研究
2.
This paper presents that the unit combination problem is solved by refined genetic algorithm.
针对电力市场条件下火力发电厂机组组合问题,提出了改进的遗传算法。
3.
This paper presents an unit combination model considering the spinning reserve and the solution based on dynamic programming of decision tree,and then it conducts actual example calculation using that method and analyses deeply the influence on re.
日前电力市场下,发电集团经常面临在给定总负荷出力曲线和总备用服务要求下,如何在机组间(厂间)进行合理分配出力/备用容量的优化问题,针对于此,提出了考虑旋转备用服务的日前市场机组组合模型和"基于决策树的动态规划法"的求解方法,并利用该方法进行了具体实例计算,深入分析了旋转备用被调用概率、结算价格和容量对机组组合模型优化结果的影响,为发电集团合理安排日前市场下机组间(厂间)负荷分配或联合调度营运提供了一定的思路和实际意义。
5)  set [英][set]  [美][sɛt]
机组
1.
A heat treatment set with screw pusher for draw bar of oil;
抽油杆螺旋推进式热处理机组
2.
The on-line monitor and diagnosis system of sintering exhaustor set is generally planned and designed and its composition and working principle are described.
对烧结抽风机机组运行状态在线监测诊断系统进行了总体规划和设计,对系统构成和工作原理进行了描述,并结合1#风机机组应用情况论述了该系统的特点及作用。
6)  generating set
机组
1.
The designed functional properties and practical behavior of the automatic start and stopping system (APS), for whole generating sets, as applied in Baosteel Power Plant s 350 MW unit, are presented.
介绍了机组自启停(APS)系统在宝钢电厂3 5 0MW机组上的功能设计及应用情况。
2.
In my view of state overhaul of hydroelectric generating set it is explained that the state ovrehaul is the development direction of overhaul of hydroelectric generating set.
对水电机组开展状态检修是水电机组检修的发展方向 ,以目前的技术水平 ,水电厂建立一个机组状态检修的在线监测系统是可能的 ,但要实现真正意义上的状态检修 ,还需要科研、设计、运行管理等部门做大量的工
3.
The Heater is important assistance in fossil-fuel power plants,The influence of several heater operation state on generating set heat economing have been quantitatively analyzed,The reference basis for economic operation of the power plant s thermodynamic systems have been provided.
加热器是火电厂热力系统中的重要辅助设备,其运行状态对机组的热经济性影响很大;针对加热器的几种运行状态对机组热经济性的影响进行了定量分析,为电厂热力系统经济运行提供参考依据。