说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 煤泥水流程
1)  slime water flow
煤泥水流程
1.
The“2+2”innovation mode of slime water flow was introduced:the two stage dehydration of cleaned slime water,two-stage inspissation and two stage water recycle of sailings flow,the lectotype and effect of the process and instruments.
介绍选煤厂“2+2”创新模式的煤泥水流程,即精煤泥两段脱水,尾煤泥两段浓缩、两段回收煤泥水流程以及工艺设备的选型和效果。
2)  slurry disposal process
煤泥水处理流程
3)  basic slime water flowsheet
煤泥水原则流程
4)  flowing cement flyash
流态水泥粉煤灰
1.
The paper discussed the construction technology and attentions of retailing backwall refill for flowing cement flyash.
阐述了流态水泥粉煤灰作为一种新型台背回填材料的工艺施工技术要点及施工中的注意事项。
5)  slime slurry
细泥煤泥水
1.
Agglomeration and flocculation settlement of slime slurry;
细泥煤泥水凝聚与絮凝沉降
6)  slime CWS
煤泥水煤浆
1.
Combustion tests on slime CWS from Changcun mine;
常村矿煤泥水煤浆的燃烧实验研究
补充资料:标准煤(见煤当量)


标准煤(见煤当量)
standard coal

、~‘~1人、4《1工兀飞coal)见煤当等
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条