说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 柴石滩水库
1)  Chaishitan reservoir
柴石滩水库
1.
Intake Tower Design of Diversion—Power Tunnel at Chaishitan Reservoir Project;
柴石滩水库工程发电引水隧洞进水塔设计
2.
The pollution sources and water quality assessment of upper reaches of the Chaishitan reservoir is analyzed.
通过对柴石滩水库及上游河道的水质评价及其污染源分析,得出水库上游河段污染物的不断累积是柴石滩水库水质污染主要成因,其中又以生活污染的贡献率最大的结论,并提出了相应的改善水质的建议和措施。
2)  Shimantan Reservoir
石漫滩水库
3)  Huangshitan Dam project
黄石滩水库工程
1.
In Huangshitan Dam project,Rockfill RCC test shows that there are distinct differences between the major material zone and the minor material zone.
黄石滩水库工程堆石料碾压试验结果表明主、次堆石区料差异较大。
4)  shoal reservoir
边滩水库
5)  Ertan reservoir
二滩水库
1.
Sediment Trap of Ertan Reservoir and Its Effect on Sediment Budget of Jinsha River;
二滩水库拦沙作用及其对金沙江流域水沙变化的影响
2.
Ecosystem service valuation of Ertan Reservoir watershed in mitigating reservoir sand sedimentation
减轻二滩水库泥沙淤积的生态系统服务价值评估
3.
Field observation and analysis of water temperature distribution in front of dam and in outflow in Ertan Reservoir
二滩水库坝前及下泄水体水温分布现场观测与分析
6)  Weitan Reservoir
围滩水库
1.
The Report on the Construction Organization Design of Weitan Reservoir;
围滩水库施工组织设计报告
补充资料:柴石滩水库

柴石滩水库

Chaishitan Reservoir


概  述

  柴石滩水库位于中国云南省昆明市宜良县境内,是珠江流域规划中南盘江中下游梯级的龙头水库,距昆明市84km、距宜良县28km。水库控制流域面积4556km2。混凝土面板堆石坝,最大坝高103m,坝顶长309.8m。坝址处多年平均流量48.4m3/s,年径流量15.3亿m3。水库正常蓄水位1640.4m,总库容4.37亿m3,有效库容2.55亿m3,为多年调节水库。坝后式电厂,装机容量3×20万kW,最大引用流量111.6m3/s,设计水头62.2m。
  坝址河谷呈"V"形,两岸地形基本对称,在坝顶高程以下,右岸山坡坡度30°~37°,左岸坡35°~37°。坝段基岩主要为砂岩、页岩、砾岩、白云岩等。
  引水发电隧洞布置在大坝左岸山体内,主副厂房及升压站布置在大坝左岸下游坝脚处。引水发电系统的主要建筑物包括:进口明渠、进水塔、隧洞、岔道、主副厂房及升压站等。引水隧洞长377m,洞径6.4m,底坡i=0.01。地震基本烈度7度。
  柴石滩水库混凝土面板堆石坝是目前我国在建的100m以上高面板坝之一,现施工已进入基础开挖。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
大王滩水库  黑龙滩水库  凌津滩水库  构皮滩水库  戈兰滩水库 
  ©2011 dictall.com