说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> ADSL网络技术
1)  ADSL Network Technology
ADSL网络技术
1.
Application of ADSL Network Technology in Well Logging Engineering;
ADSL网络技术在测井工程中的应用
2)  ADSL network
ADSL网络
3)  ADSL technology
ADSL技术
1.
Application of ADSL technology to automatic monitoring of distribution grids;
ADSL技术在配网自动监控中的应用
2.
Analysis the safety precautions campus network built based on ADSL technology
浅析基于ADSL技术下的校园网搭建及安全防范
3.
This paper introduces the technology selection and the successful application of the ADSL technology in the construction of local area network of Baiyunebo Iron Mine,indicates the actual operating effects of tracking and monitoring in the three years and the benefits.
文章重点介绍了ADSL技术在白云铁矿局域网组网建设中的技术选型、成功应用,简要介绍了经过近3年来跟踪监控、测试的实际运行效果和给白云铁矿带来的效益。
4)  ADSL technique
ADSL技术
1.
The paper intrduces the application of ADSL technique in Huainan Power Supply Company,and discusses its future application at the same time.
对ADSL技术在淮南供电公司的应用进行了介绍,对其应用前景进行了展望。
5)  ADSL
ADSL技术
1.
By now, "ADSL" is widely used in internet communication.
“最后一公里”的解决方法、ADSL技术的特点和接入模型值得分析和探讨。
6)  ADSL insertion technique
ADSL接入技术
补充资料:网络技术
网络技术
network techniques
    研究网络一般规律和计算方法的技术。又称统筹法。网络技术是用网络图的形式把一项任务的有关活动有机地组成一个整体,并通过分析和计算求得最优化效果的技术。是一种编制工程速度计划,并对计划实行科学管理的有效方法。网络技术的基础是网络图,基本方法是先编制网络图,再利用网络图优化工程计划。
   网络图是由工序(箭)、节点(圆圈)、线路、时间参数和时间坐标四大部分构成的。工序指工程中的备料等工艺程序;节点是一种表示工程开始、结束或工序分界的符号,通常用圆圈内标上数码编号表示,如①②等;线路是按顺序或逻辑关系连结起来的工序所组织的道路,通常用双实线或粗实线表示;时间参数分工序工时和节点参数两种,前者指该工序从开工到完工所耗时间,一般用数目字标注在工序下方;节点参数包括节点、节早和节迟,节早指最早能够开工时间。节迟指最迟必须开工时间;时间坐标分累积日期坐标和日历日期坐标,一般置于网络图的上方或下方。
   编制网络图的步骤:①分解工程。②列出工序清单。③画出草图。④计算网络时间并标上草图。⑤找出关键线路(消耗时间最长、决定工程总工期的线路)、算出总工期。⑥调整布局配置时间坐标。
   调整和优化网络计划的根本途径可以归纳为:向关键线路要时间,向非关键线路要资源。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。