1) saturation line
浸润线
1.
Spatiotemporal chaos of saturation line in tailings dam and its safety mechanism;
尾矿坝浸润线时空混沌及其安全机理
2.
Application of water seepage drainage by radiation well in dropping dam saturation line;
辐射井排渗在降低尾矿坝体浸润线中的应用
3.
Calculation of saturation line of groundwater under reservoir water table uniform rising;
库水位等速上升作用下岸坡地下水浸润线的计算
2) Seepage line
浸润线
1.
Seepage line shape characteristic and analysis of the familiar mistake of seepage flow calculation;
浸润线形状特性与渗流计算常见错误剖析
2.
Forming cause analysis and dealing imagination for that the seepage line in the right of the Dawangtan reservoir main dam is inclined to the high;
大王滩水库主坝右侧浸润线偏高的成因分析及处理设想
3.
The key to bring the earth-rock dam under control is to define the position of seepage line.
对病险土石坝进行病害诊断及治理,确定坝体浸润线位置是关键,常用的计算浸润线的方法有实测方法和水力学计算法,但这两种方法在实际工作中往往受到一定条件的制约。
3) phreatic line
浸润线
1.
Analytic solutions for phreatic line in reservoir slope with inclined impervious bed under rainfall and reservoir water level fluctuation
库水位升降联合降雨作用下库岸边坡中的浸润线研究
2.
The following problems have been studied:engineering classification of landslide;selection of parameters of slip surfaces;computation of seepage pressure;determination of phreatic line when water level declines;selection of calculation performance and the evaluation of landslide stability.
在分析重庆市三峡库区滑坡勘察、设计资料的基础上,总结了库区滑坡治理工程中反映出的几个主要勘察问题,并对滑坡的工程分类、滑面参数的取值方法、渗透压力的计算方法、库水作用下坡体内浸润线的确定方法、计算工况的选取以及稳定性评价等问题进行了分析研究,在此基础上提出了一些切实可行的方法或措施,可供工程技术人员在实际工程中参考使用。
3.
Under the long\|term action of flood,the phreatic line rises and reaches the toe of the landslide slope.
在长期洪水渗透的作用下 ,堤防内的浸润线上升并到达背水坡脚 ,这会引起堤防内的孔隙水压力上升和非饱和状态土的强度下降 ,经常由此而导致堤防发生塌陷和滑动破坏 。
4) infiltration line
浸润线
1.
And the calculation formula of nonlinear infiltration line are reasoned by using seepage motive formula and experimental seepage resistance factor.
根据渗流动力方程及试验确定的阻力系数拟合方程,导出了堆石体内各流区运用的非线性渗流浸润线计算式。
2.
Setting up the numerical value model of three-dimensions seeping to realize it eration solution of random seeping surface, getting the each infiltration line chart of accounting level sections through example calculation of high steep slope three-dimension seeping by surface water system.
通过对高陡边坡三维渗流问题的实例计算,得到了计算水平各个剖面的浸润线图,结果表明与实际情况相符,为边坡安全设计、工程处理提供依据。
6) curve of infiltration
浸润曲线
补充资料:浸润线观测
浸润线观测
saturation line observation
水位特征过程线、位势过程线等。并可运用回归方程来预报竹水位以及推求实际渗透系数等。 (张中午)为淤积竹段,_卜接进水竹段(花竹段),管壁钻有孔距为1〔)()一12()毫米,孔径(;一8毫米的进水孔(见图2)有孔段的卜下端应分别高于或低于设计最高或最低浸润线)进水管段的上面为引导管,用以将观测管引伸到坝体表面,管口加设防护措施,防止雨水灌入及避免堵塞。整个观测管要求铅直和内壁光滑,以利J二观测管内水位。 观侧仪器和观侧要求 常用的观测管水位观测仪器有测深钟、电测水位器及示数水位器等观测时用钢尺或测绳将仪器吊放入观测管中测读管内水面与管口之间的距离,再由管口高程换算成管水位高程。一些观测管数量较多或渗流现象比较复杂的大型土坝,常采用集控式或自计式观测设备,其一铅丝两层麻布第_几层过滤层第层过滤层进水孔 ┌───────┐ │翰麟魏 │ ├───────┤ │隔刀/// │ ┌─┼───────┼─┐│之│妙另了代从7冷 │口│├─┴───────┼─┤│一淘尸刀/// │刀│├─────────┴─┤│叫 │├───────────┤│_{ │├───────────┤│{~-、~日 │└───────────┘封闭底板图2观测管进水段示意图次感应仪器有:重锤跟踪仪、压力传感器、激光测距仪、声波测距仪、变电容式或浮子式液压计等。转换形式有码盘寄存、等级电压转换、光电脉冲、模拟电压转换、接触式码盘、振弦式压力频率传感器及电容电桥等〔) 卜坝运用初期,浸润线观测一般每天一次;正常运用期,一般不少于l()天一次;当水位上升较快或超过正常高水位时,应适当增加测次;当地震或渗透异常时,也应增加测次。其精度要求:两次读数差.对于大型水库土坝,不应大于1厘米;对于中型水库土坝,不大卜2厘术。 上坝在运用中属1二非稳定渗流,而且影响上坝浸润线位置的因素很多,如上游库水位、下游尾水位、坝体结构形式、筑坝材料、基础地质条件、降雨、气温及大气压力等。在进行观测时,应同时进行库水位、坝后渗水流量、渗水透明度、坝前分层水温、测压管内水温及大气压力等项目观测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条