1) Covering
加盖
1.
Study on Odor Control Measure by Covering Regulation Tank in Changshengqiao Waste Sanitary Landfill Site of Chongqing;
重庆长生桥垃圾卫生填埋场调节池加盖防臭措施研究
2) covering design
加盖设计
1.
Taking the covering and deodorization project of second-phase biological reaction tank of Datansha WWTP in Guangzhou City for example,the difficulties and method for the covering design,selection and design parameters of deodorization process,and main points for design of structures ventilation were introduced,and the expe.
以广州市大坦沙污水处理厂二期生物反应池加盖除臭工程为例,介绍了加盖设计的难点与方法、除臭工艺的选择与设计参数以及构筑物通风设计的要点,总结了工程设计的经验,可为类似工程的实施提供借鉴和指导。
3) Film covering
膜加盖
4) covered and enclosed
加盖密闭
5) CAB and slagging effect
加盖渣洗
6) Covers for the Rivers
河道加盖
参考词条
补充资料:1350mm双流板坯连铸机(重庆钢铁设计研究院设计)
1350mm双流板坯连铸机(重庆钢铁设计研究院设计)
叠 135Omm双流板坯连铸机(重庆钢铁设计研究院设计)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。