说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 方案比选
1)  scheme comparison
方案比选
1.
Special rules of mine engineering scheme comparison;
矿山工程方案比选的特殊规律
2.
Numerical simulation on scheme comparison between two concrete-plug lengths of west tunnel-type anchorage of Balinghe Suspension Bridge;
坝陵河悬索桥西岸隧道式锚碇锚塞体长度方案比选的数值模拟研究
3.
Applications of value engineering in scheme comparisons of a subway station extension project designs
价值工程在地铁车站扩建设计方案比选中的应用
2)  scheme comparison and selection
方案比选
1.
The construction scheme comparison and selection of soft country rock large-span railway tunnel
软弱围岩大跨铁路隧道的施工方案比选
2.
This paper describes the process of the scheme comparison and selection, design and construction of the construction trestle on the north bank side of Badong Changjiang River Highway Bridge.
介绍巴东长江公路大桥北岸施工栈桥方案比选、设计与施工。
3.
Taking the danger-removed and strengthened structures of Quting Reservoir as the example, this paper illustrates that the work organization plan plays a very important role in scheme comparison and selection of hydraulic structure, determination of foundation data, job schedule and total investigation.
以曲亭水库除险加固工程为例,说明施工组织设计在水利工程设计中对水工建筑物的方案比选、基础资料的确定、工程进度以及总投资都起着非常重要的作用。
3)  plan selection
方案比选
1.
The selective principle of four bridge plans, plan design and plan selections are introduced.
介绍了 4种桥型方案的选择原则、方案设计及方案比选
2.
This paper discusses the influential factors of bridge plan selection, then expounds the influence of economic index on bridge plan selectio
在论述桥梁方案比选的影响因素的基础上 ,进而阐明经济指标对桥梁方案比选的影
4)  scheme selection
方案比选
1.
Research on capital structure scheme selection of dedicated passenger railway;
铁路客运专线融资结构方案比选研究
2.
This paper expounds the basic situation of project construction region and the water supply situations of YRDP and Taiyuan City, demonstrates the necessity and urgency of project construction, and analyzes the situation and feasibility of scheme selection and project site selection for backup water source.
阐述了项目建设区域的基本情况以及引黄工程供水系统和太原市供水状况,论证了项目建设的必要性和迫切性,分析了备用水源方案比选及项目选址的情况及其可行性。
3.
The method and process of scheme selection of port overall layout using AHP under complex circumstances in port engineering are presented.
通过港口工程因素识别、构建层次模型、构造判断矩阵、因素权重分配、一致性检验、分值计算及综合评定等步骤,将人为的主观性依据用数量形式表达出来并进行量化综合比较,从而避免了传统方案比选采用定性判断的不足。
5)  project selection
方案比选
6)  alternative options
比选方案
补充资料:比选
1.考校选择。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条