说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 新立矿区
1)  Xinli mining area
新立矿区
1.
Seepage characteristic of rock mass in the Xinli mining area based on fracture geometry measurement method;
基于裂隙量测法的新立矿区工程岩体渗透性分析
2)  Xinli coal mine
新立煤矿
1.
Spontaneous combustion mechanism analysis and experiment of gangue hill in Xinli coal mine
新立煤矿矸石山自燃机理分析与实验
3)  Xinwen Mining Area
新汶矿区
1.
Research and application of the correlativity between calorific value and ash of coal in Xinwen Mining Area;
新汶矿区煤炭发热量与灰分的相关关系及其应用
2.
Discussion on the Gangue Utilization in Recovery and Control of Land Subsidence in the Xinwen Mining Area;
利用煤矸石恢复治理新汶矿区沉陷土地探讨
3.
Limit Value Confirmation of Roadway Roof Separation and Safety Evaluation of Xinwen Mining Area;
新汶矿区巷道顶板离层界限值确定与安全评价
4)  Fuxin mining area
阜新矿区
1.
Study on the Characteristics of Habitat Succession and Its Evaluation of Gangue Pile from Fuxin Mining Area;
阜新矿区煤矸石山生境演变特征及其评价研究
2.
Combine characteristics of gangue in Fuxin mining area with research findings, based on calcium/magnesium/silicium ratio and heat value, the author set forward a preliminary version of industrial classification of blended gangue stockpile utilization.
本文从煤矸石资源利用出发,详细分析了煤矸石传统分类的优缺点,结合阜新矿区煤矸石特征及研究成果,基于钙镁硅比值和发热量,提出了混堆煤矸石利用工业分类的初步方案。
5)  Xinji mine
新集矿区
1.
Optimized design of coalbed methane development with reference to Xinji mine;
煤层气开发井网优化设计——以新集矿区为例
6)  New Mine Area
新建矿区
补充资料:阜新矿区
      中国年产千万吨以上的大型煤矿区,东北地区的动力煤生产基地。所辖煤田位于辽宁省西部,界跨阜新、义县之间,矿区内有新义铁路穿过。阜新煤矿已开采70多年。现在的生产矿井绝大部分是1949年以后建成的。1950年煤炭产量仅253万吨,1957年增长到755万吨,1969~1981年,一直保持在1000万吨以上,其中1978年产量达1360万吨。1981年末有生产矿井、露天矿22处,设计能力 985万吨。海州露天矿是1949年后建设起来的大型露天矿,1953年投产,设计能力300万吨,1981年产量达到451万吨,占矿区总产量的43.6%。原设计能力为年产150万吨(后扩建为180万吨)的五龙矿立井,也是1953~1958年建成的。设计能力年产 120万吨的王家营子立井正在建设中。阜新煤矿的煤炭洗选能力比较大,现有洗煤厂6座,设计洗煤能力为900万吨,1981年入洗原煤559万吨,筛选原煤247万吨,合计洗选原煤806万吨,占全矿区原煤总产量的82%。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条