1) installation measure
安装措施
2) installation and debugging measure
安装调试措施
3) the technology of equipment and operation
安装施工技术措施
4) safety measure
安全措施
1.
The electric fireproof and explosion-proof safety measures of industrial and mining enterprises and dangerous source distinguishing;
工矿企业电气防火防爆的安全措施及其危险源辨识
2.
The main factors influencing the safe production in particular is analyzed t,and the related safety measures and the design of interlocking system is proposed.
针对次磷酸钠生产中的尾气属易燃易爆、有毒有害气体,参考了热法磷酸燃烧水合一步法的工艺流程,在次磷酸钠生产中的尾气燃烧水合,转化为磷酸的工艺中,着重分析了影响安全生产的主要因素,提出了相关的安全措施以及连锁系统的设计。
3.
This paper introduces in detail the structure, performance, test run programme, operation methods and safety measures of the ball mill, and expounds the importance of the test run in the whole course of erection and its working programme, which possesses general reference value for the test run of the erection of equipment.
详细阐述了球磨机的构造和性能、试运转程序、操作方法和安全措施,阐明了试运转工作在整个安装过程中的重要性和工作程序,对设备安装的试车工作具有普遍的参考价值。
5) safety measures
安全措施
1.
Constructing crafts and safety measures of artificial digging-hole pile;
人工挖孔桩的施工工艺与安全措施
2.
On the safety measures for leakage prevention of underground oil depot(tank) and prevention of groundwater pollution;
浅议地下贮油库(罐)的防泄漏安全措施和地下水的污染防护
3.
Simultaneously,to ensure the safety and efficiency in mining,specific safety measures and requirements are also presented for the site operation.
在调查、分析龙山金锑矿老窿残矿赋存特征和开采技术条件的基础上,结合矿山生产实际,采用脉外平巷加穿脉群开采技术,并对现场施工提出具体的安全措施和要求,确保安全、高效地回收老窿残矿。
6) safety precautions
安全措施
1.
The safety precautions for network accounting data;
网络化会计数据的安全措施
2.
The manufacturing technology of phosgene and its derivative products,and relevant safety precautions,are reviewed herein,along with the current status of domestic and foreign production and use of phosgene.
综述了光气生产工艺技术、安全措施及主要光气下游产品种类。
3.
The fatalness analytical method in advance (PHA) to analyze the existent risk in the course of rebuilding sure-high pressure fire fighting water system for refinery is employed to work out the safety precautions, and the evident effect has been gained after actualizing it.
运用预先危险性分析法(PHA),对炼油厂稳高压消防水系统改造过程中存在的风险进行了分析,采取安全措施,取得了明显效果。
补充资料:安装计划
安装计划
installing plan
anzhuang Jihua安装计划(i nstalling plan)设备安装单位为保证设备安装质量和进度所制定的包括安装程序、调试方法、使用工具、质量要求、工作进度和各有关部门的职责和工作接口等内容的技术管理文件。 安装计划的主要内容包括: ①确定安装程序。根据设备特点、环境要求、安装技术力t和水平进行合理安排,以保证有计划、有步骤地按期、保质地完成安装任务b ②确定安装工程的技术要求。根据图纸、设计说明书及安装说明书,对设备各部分的安装技术要求作出明确规定,作为安装过程的技术准则和检查、验收的依据。 ③确定安装工程的施工条件。安装前,除应做好配套设施的准备外,还应对临时建筑物、运输、道路、安全措施、消防设施、主要机具和劳动力等做好充分准备和合理安排。安装工序中有恒温、防展、防尘或防潮等要求的,应在安装地点具备或采取相应措施后,方可进行该工序的施工。 ④确定安装程序的施工方法。根据安装程序,确定施工的技术措施和施工方法,如平行作业法、流水作业法、整体安装法或分步安装法等。 ⑤确定安装工程所需的机具和材料,包括安装所需的常用工具、专用工具、运输设备及所需的各种材料。 ⑥确定安装工时、工时定额及安装技术工人数量及等级。 ⑦确定试运转的方案及步骤。 ⑧确定安装工期。(刘明李跃生)