1) landfill cover soil
填埋覆土
1.
Research progress on methane oxidation in landfill cover soil.;
填埋覆土甲烷氧化微生物及甲烷氧化作用机理研究进展
3) filling of covering soil
覆土填筑
1.
The article introduces the engineering background and the geological conditions of 10# Land Sand-Blowing and Sand-Filling Ground Leveling Project in Sixin Area of New Zone in Wuhan,and introduces the blowing and filling design of this project from three aspects of the vertical design of ground leveling,the design of enclosing banks between fields and the filling of covering soil.
该文介绍了武汉新区四新地区10#地块吹填砂场平工程的工程背景及地质条件,并从场平竖向设计、围埝设计、覆土填筑三方面介绍了该工程的吹填设计。
4) land fill
土地填埋法
5) landfill cover material
填埋场覆盖材料
1.
Research of sludge from water purification plant as landfill cover material;
自来水厂污泥作填埋场覆盖材料的试验研究
6) landfill cover
垃圾填埋场覆盖层
1.
Analysis of water movement in landfill cover soils using information theory measures
垃圾填埋场覆盖层土壤水运动信息测度分析
补充资料:安全填埋
分子式:
CAS号:
性质:指对危险废物在安全填埋场进行的填埋处置。为了防止填埋废物与周围环境接触,尤其是防止地下水污染,在设计上除了必须严格选择具有适宜的水文地质结构和满足其他条件的场址外,还要求在填埋场底部铺设高密度聚乙烯材料的双层衬里,并具有地表径流控制、浸出液的收集和处理、沼气的收集和处理、监测井及适当的最终覆盖层的设计。在操作上必须严格限定入场处置的废物,进行分区、分单元填埋及每天压实覆盖,并特别要注意封场后的维护管理,通常要求在封场后应至少持续维护管理20年。
CAS号:
性质:指对危险废物在安全填埋场进行的填埋处置。为了防止填埋废物与周围环境接触,尤其是防止地下水污染,在设计上除了必须严格选择具有适宜的水文地质结构和满足其他条件的场址外,还要求在填埋场底部铺设高密度聚乙烯材料的双层衬里,并具有地表径流控制、浸出液的收集和处理、沼气的收集和处理、监测井及适当的最终覆盖层的设计。在操作上必须严格限定入场处置的废物,进行分区、分单元填埋及每天压实覆盖,并特别要注意封场后的维护管理,通常要求在封场后应至少持续维护管理20年。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条