1) treatment measure
处理措施
1.
Analysis of geologic defect and treatment measure for Yinpan hydropower station;
岩溶地质缺陷分析与处理措施
2.
Defective reservoirs Engineering geological problems encountered in reservoir regulation and treatment measures;
水库治理中存在的工程地质问题及处理措施
3.
Quality questions in lining construction of Nanliang tunnel in Shijiazhuang-Taiyuan railway line and treatment measures thereof;
石太线南梁隧道衬砌施工质量问题及处理措施
2) Treatment Measures
处理措施
1.
The causes of faulted borehole concrete-pouring stakes and the treatment measures on it;
钻孔灌注桩断桩原因及处理措施
2.
Fissure prevention and treatment measures in constructing of Guanyinge dam;
观音阁大坝施工中防止裂缝和裂缝处理措施
3.
On common problems of the bored pile foundation construction and the treatment measures;
浅谈钻孔灌注桩桩基施工常见问题及处理措施
3) treatment
[英]['tri:tmənt] [美]['tritmənt]
处理措施
1.
Crack prevention and treatment measures for ferroconcrete structure;
钢筋混凝土结构裂缝问题的预防与处理措施
2.
Main technical difficulties and its treatments of Yele Hydropower Station Project;
冶勒水电站工程主要技术难点及处理措施
3.
Analysis and Treatment to the Accident of a Reinforced Soil Retaining Wall;
某加筋土挡墙的事故分析及处理措施
4) countermeasure
[英]['kaʊntəmeʒə(r)] [美]['kauntɚ'mɛʒɚ]
处理措施
1.
Character of rock outburst and countermeasure in Zhongnanshan highway tunnel;
终南山公路隧道岩爆特征与处理措施
2.
On the factors that influence the flatness of asphalt pavement and the countermeasures;
浅析影响沥青路面平整度的原因及处理措施
3.
, And discusses the cause of asphalt pavement s out-of-flatness and its countermeasure.
作者通过对几个工程所出现的不同程度的坑凹、接缝台阶、波浪、碾压车辙、桥涵与路面接茬不平、跳车等路面不平整现象的分析,探讨了沥青路面产生不平整的原因并提出了处理措施。
5) countermeasures
处理措施
1.
Discussion on the causes and countermeasures of prestressed tube piles floating;
浅析预应力管桩浮桩原因及处理措施
2.
On the causes and countermeasures of the water leakage of continuous walls in foundation pits;
基坑地下连续墙渗漏水事故原因和处理措施
3.
This paper mainly intrduces the usual accidents in underwater concrete pouring and its countermeasures.
本文着重介绍水下混凝土灌注施工中的常见事故及相应的处理措施。
6) Processing measure
处理措施
1.
Through the description of the geology along Wu-Xi line,it mainly analyses the forming reasons of wind sand along Wu-Xi line and the features of wind sand disaster,puts forward the line selecting principle and project processing measures of the railway in wind sand area,so as to make line selection in wind sand area more reasonable.
通过对乌锡线所处地质环境的论述,主要对乌锡线风沙形成的原因及其灾害特征进行了分析,提出了风沙区铁路的选线原则与工程处理措施,从而使得风沙区铁路选线更加合理。
补充资料:不合格品纠正措施(见纠正措施)
不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions
bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条