说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 400m以上综采工作面
1)  over 400 m length fully mechanized coal face
400m以上综采工作面
2)  fully mechanized mining face
综采工作面
1.
Study of fully mechanized mining face dust pollution status;
综采工作面粉尘污染状况研究
2.
Comprehensive evaluation model for the safety of fully mechanized mining face based on unascertained measure and AHM;
综采工作面安全性的未确知-AHM综合评价模型
3.
The multi-level grey entropy comprehensive evaluation on safety of fully mechanized mining face;
综采工作面安全性多层次灰熵综合评价
3)  fully mechanized face
综采工作面
1.
Application of PROMOS monitoring control system in fully mechanized face;
PROMOS监控系统在综采工作面中的应用
2.
The study on reliability of man machine environmentsystem of fully mechanized face based on neural network;
基于神经网络的综采工作面人-机-环境系统的可靠性研究
3.
On the basis of realizing the gently inclined coal seam mining,the mining craft,technique research and feasibility of the 18~25° large inclined angle and down inclined fully mechanized face are further analyzed.
文章在实现缓倾斜煤层开采的基础上,进一步对18~25°大倾角俯斜综采工作面的回采工艺、技术研究以及可行性进行探索分析。
4)  fully mechanized coal mining face
综采工作面
1.
Gas accumulation automatic monitoring-processing method on upper corner of fully mechanized coal mining face;
综采工作面上隅角瓦斯积聚自动监控处理方法
2.
Application of high level gas drainage gateway to high gassy fully mechanized coal mining face;
高位瓦斯排放巷在高瓦斯综采工作面的应用
3.
Forecast of faults concealed in fully mechanized coal mining face by use of small fold;
小褶曲在综采工作面隐伏断层预测中的应用
5)  fully mechanized coal face
综采工作面
1.
Based on the optimization design of fully mechanized coal face influenced by distributed fault in Chengjiao Colliery,the author has represented the layout of bench and fan face to extract coal in the triangular area,which has improved the recovery coefficient and provided a technological basis for similar fully mechanized coal face.
本文通过对城郊煤矿受断层影响的综采工作面进行优化设计,提出了台阶形和扇形回采三角煤的工作面布置方式,解决了工作面丢三角煤的问题,提高了工作面回采率,为今后类似条件下综采工作面的合理布置回采提供了一定的技术基础。
2.
The reasons of roof fallen in the fully mechanized coal face are analyzed.
对综采工作面顶板漏矸漏顶的原因进行分析,提出了积极的预防与控制措施,对煤矿的安全高效生产具有现实指导意义。
3.
This paper introduces the methods and measures of the adjustment of support tilt caused by ultrahigh mining in fully mechanized coal face.
本文介绍了综采工作面回采超高时倾斜歪倒支架调整的方法及措施。
6)  fully-mechanized face
综采工作面
1.
Feasibility of continueous winning in fully-mechanized face across a empty drift;
综采工作面过空巷连续采煤的可行性探讨
2.
This paper analyzes the roof leakage accidents at the end of fully-mechanized face in Wangcun Coal Mine,and advances some measures for preventing roof leakage.
对王村矿综采工作面端头顶板漏顶事故进行了分析,并提出了防治漏顶的措施。
3.
From human-machine system,environment system,technique system,power-supply system and support-rock system,the reliability analysis of fully-mechanized face is expounded.
应用可靠性理论对综采工作面进行分析,进而找到影响可靠性的因素,提出改善系统可靠性的意见,从而达到提高矿井的产量,增加经济效益的目的。
补充资料:规模以上工业企业

规模以上工业企业:指全部国有工业企业和年产品销售收入500万元以上的非国有工业企业。2005年规模以上工业企业完成增加值66425亿元,占全部工业增加值的比重为87.2%。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条