1) bolt interval
锚杆间排距
2) anchor spacing
锚杆间距
3) space of the pile
锚桩间距
4) anchor space
锚固间距
1.
In order to study reinforcement effects influence of anchor space and preloaded on strengthening RC T-beam by bonded steel plates,based on scale model test of 8 RC T-beams,the systematic experimental study of mechanical behaviors of strengthened RC T-beam by bonded steel plates with the different anchor spaces under initial stress were carried on.
为了研究锚固间距、持荷对黏贴钢板加固钢筋混凝土梁加固效果的影响,以8片钢筋混凝土T型梁实桥缩尺模型试验为基础,对不同锚固间距及有无初应力作用下,黏贴钢板加固钢筋混凝土T型梁的力学性能进行了系统的试验研究。
5) pier spacing radial gate
锚墩间距
6) hole interval
锚孔间距
补充资料:采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
霹 采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条