说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 验收
1)  acceptance [英][ək'septəns]  [美][ək'sɛptəns]
验收
1.
Studying on quality of the pig iron for steelmaking to be check before acceptance;
外购炼钢生铁的质量验收的实践
2.
The normative acceptance of medical equipment;
医疗设备的规范验收管理
3.
Construction of rural water supply project and quality acceptance;
农村供水工程施工及质量验收
2)  check and accept
验收
1.
For automotive brake system ductile casting QT450-12,in case of ensure mechanical property,internal and external automotive casting provider have greater discrepancy in casting microstructure and composition at check and accept that,most of internal company only concerned the pearlite content,but aboard company more concerned graphite form.
对于汽车用铸态制动类球墨铸铁QT450-10铸件,在保证力学性能符合要求的前提下,国内外汽车铸造厂商对铸件组织和成分的验收存在明显的差异,国内企业强调铸件珠光体含量的验收指标,国外企业更重视铸件石墨组织的验收
2.
Some existing problems are pointed out during on-spot monitoring for check and accept of completed project.
针对建设项目竣工环境保护验收监测中存在的一些疑难问题,分别从废水监测中采样点位的确定和描述及采样时间的确定、清污合总排口的情况下监测点位的确定;厂界噪声监测中测点的选择、背景值的修正与测量、环境敏感点的监测;废气监测中无组织废气监控点的布设、有组织废气采样方法的选择、燃烧性废气监测中过剩系数的影响;验收监测期间的生产工况的确定等方面进行了探讨,提出了一些解决办法。
3.
Following article mainly discuss some basic principles of how to choose ,check and accept the sampling machine for coal flow sampling.
主要论述了在煤流中采样使用的采样机的选择和验收中的一些基本的原则。
3)  acceptance check
验收
1.
The necessity of acceptance check of CNC machine tool is introduced,the procedure of acceptance check and problems that should be paid attention is described.
介绍了数控机床验收的必要性,对验收过程和应注意的问题进行了阐述。
2.
The procedure and content of acceptance check for chemical engineering construction project are introduced systematically.
结合作者的实际工作 ,总结了对工程建设实施“三道质量控制工序”的经验 ,强调了过程质量控制的重要性 ,较为系统地介绍了化工建设项目预验收工作的程序和内
3.
As the final step of the execution of the equipment purchase contract, acceptance check is very important for proper operation of the equipment.
为确保新购医疗设备能正常地、安全地运行,验收工作是十分重要的,它是装备购置合同执行中的最后一个环节。
4)  check and acceptance
验收
1.
CFRP sheet strengthening for a certain project and the check and acceptance of strengthening quality;
某工程碳纤维布结构加固及其加固质量的检查与验收
2.
The monitoring of environmental protection check and acceptance of CFB boiler shows that the total desulphurization rate reaches from 93.
通过循环流化床(CFB)废气污染源验收监测,CFB锅炉的总脱硫效率可达93。
3.
Based on the practical experience in the production of concrete interlocking block of Yangpu Port Phase II Project, it introduces the key factors of experiment, production, quality control, as well as check and acceptance of concrete interlocking block.
结合洋浦港二期工程混凝土联锁块生产的实践经验,简述混凝土联锁块试验、生产、质量控制及验收等要素。
5)  Check [英][tʃek]  [美][tʃɛk]
验收
1.
Installation and check of the atom fluorescence spectrum;
SK-2003Z型原子荧光光度计的安装与验收
2.
About installation and checking of large medical equipments;
浅谈大型医疗设备安装与验收工作的组织
3.
This paper mainly introduces several aspects of management of medical equipments in our hospital such as purchase, check in,use,maintenance,metrology and scrapping.
主要阐述了我院医疗设备管理过程中的采购、验收、使用、保养、维护、计量直至最后报废各环节的做法。
6)  acceptance check
验收;核收
补充资料:验收


验收
acceptance of a nuclear power plant

  yonshou验收(aeeeptanee of anuelear power plant) 指业主和供货商之间为澄清双方就完成合同规定的有关供货责任的协议并通过证书形式予以确认的过程。按国际商业惯例一般分为两大阶段,即临时验收和最终验收。由于核岛、常规岛或电厂配套设施(B()P)的临时验收和最终验收的条件可能各不相同,一般都分别在它们的供货合同中明文规定。 临时验收当核电厂完成机组调试、性能试验和满功率示范运行,核电厂各系统和设备运行正常,机组的性能保证值和技术指标全部达到,按照供货合同规定,业主将对核电厂的系统和设备进行临时验收,业主向供货商颁发临时验收证书(provisional aeeeptaneeeertifieate,PAC)。此时仍然可能有在核电厂安装、调试等过程中发现的尚未解决的但不影响机组安全、可靠和满负荷运行的一些缺陷及合同遗留项。为了不致造成PAC签字的延误,业主和供货商双方应就这些遗留问题的每一项进行讨论并达成一致,由供货商承诺每个问题的处理办法和解决问题的截止时间,最终由业主认可作为PAC的附件。PAC遗留项可包括核电厂设计、制造、施工、安装和调试过程中涉及到供货商责任的一切遗留问题,其中最主要的是调试过程中发现的不符合项,一般包括未完成的性能试验和调试项目、供货商责任范围内的不符合项处理方案、设备零部件缺漏或损坏及与之相连的补充供货、供货文件、图纸的遗漏等。临时验收证书签署之后,根据合同规定一般业主需向供货商支付最后一笔合同余款,约为合同总价的5%~10%。从临时验收证书签署之日起,一般按合同要求,核电厂的主要设备还有一定的保证期,根据合同规定一般为一年或两年,或至第一次换料后重新并网。有些关键设备,如蒸汽发生器,其保证期为两年或两年以上。 最终验收在临时验收证书签署之后的一至二年的设备保证期内,所有PAC遗留项应得以清除。在保证期内,在正常操作情况下如果核电厂设备系统的任何部分发现缺陷或损坏,设备供应商应负责尽快予以修理、更换或采取其他补救措施.在对核电厂造成大的经济损失时根据合同规定有时还可以要求供货商给予赔偿。在设备保证期结束时,若某些设备的缺陷仍未消除,供货商除了对设备进行修理和更换外,其设备保证期将相应延长。通常情况下,保证期结束时如果所有PAC遗留项已经解决,保证期内出现的各种问题也都已经得到满意的处理,核电厂的系统和设备上不再存在大的设备缺陷和技术问题时,业主将对核电厂的系统和设备进行最终验收,业主向供货商颁发最终验收证书(final aeeeptanee eertifieate,FAC),这标志着供货的保证期结束,也即供货商的合同总体责任的结束。在FAC签署时,一般还存在两类保留项:一类是PAC的保留项在处理完毕后,这些保留项的保证期要相应顺延,而且在签署FAC时它们的顺延保证期尚未结束;第二类是PAC签署之后新发生的问题尚未处理完毕,如果这些问题较小且不影响其性能和运行,可作为FAC的遗留项提出,与供货商共同商定解决方案,并由供货商承诺解决的措施和期限。FAC遗留项汇总成一份清单,作为FAC的附件,要求供货商在保证期结束后继续解决。 FAC签署后,供货商将从银行等信用机构撤回抵押的信用保函。FAC签署之后,除FAC保留项以外,供货的保证期已结束,如供货设备再出现新的问题一般不能再向供货商提出索赔,而要通过业主和供货商之间新的合同安排予以处理。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条