1)  waste-filling
矸石充填
1.
The new technology of waste-filling replacement mining on strip coal pillar;
利用矸石充填置换开采条带煤柱的新技术
2)  waste stone.filling
煤矸石充填
3)  waste packing unit
矸石充填设备
1.
The paper introduces the overall structure of underground roadway waste packing unit,puts forward the design scheme of several key components and equipment matching.
本文介绍井下巷道矸石充填设备的总体结构,提出几个关键部件的设计方案及设备配套情况,并介绍了在河北金牛能源股份公司邢东矿井下的应用情况。
4)  conveyor for waste stone packing
矸石充填带式输送机
5)  gangue
矸石
1.
The scheme design and recovery evaluation of low calorific value coal from gangue;
从矸石中回收低热值煤的方案设计与效果分析
2.
Research of switched reluctance motor control system for coal gangue hoist;
煤矸石绞车开关磁阻电动机控制系统的研究
3.
To avoid wasting of coal resource,mitigate mixing of gangue into coal and raise benefit of mine,it is decided to carry out feasibility study of dry dressing of gangue-containing coal.
霍林河1#露天矿煤层赋存条件复杂,采用大型设备有绝大部分薄煤层无法分采,而造成煤炭损失,为了降低煤炭资源的浪费、减少矸石混入、提高煤矿的经济效益,决定对杂煤进行干式分选的可行性分析研究。
6)  waste rock
矸石
1.
Automatic separation of waste rock in coal mine based on image procession and recognition;
基于图像处理与识别技术的煤矿矸石自动分选
2.
It also gives the application of SRD in the mine winch of waste rock.
介绍了开关磁阻电机调速系统的构成、工作原理和特点,及其在煤矿矸石山绞车上的应用。
3.
Aiming at 3 main problems of coal under village, filling mining of strip pillar and disposal of underground waste rock,the paper put forward a program of mining strip pillar with waste rock filling on the basis of physical and mechanical test of waste rock and numerical simulation.
针对许厂煤矿面临的村庄建筑物下的压煤、条带煤柱的置换开采、井下矸石处理3个主要问题,在矸石物理力学指标测试、数值模拟研究的基础上,提出了可行的矸石置换开采建筑物下条带煤柱的方案。
参考词条
补充资料:矸石
矸石
waste

   采矿过程中,从井下或露天矿采场采出的或混入矿石中的岩石(废石)。俗称矸子。煤层中间的薄岩层叫夹石或夹心矸子。在煤的开采中,大于50毫米的矸石量占全部煤产量的百分率称为含矸率。矸石常是煤的灰分增加的重要原因。所以在生产过程中应积极采取措施,减少矸石的混入,降低含矸率,提高原煤质量。堆置废石或矸石的场地的位置应考虑卫生和安全的要求,矸石场的边界距风井不小于80米,距公路不小于60米,应远离居民区和高压供电线路,并设在下风向。