1) load dependence
载荷相关性
1.
Nanoindentation tests on Ti6Al4V alloys and nitrogen implanted Ti6Al4V alloys using an in situ nano-mechanical testing system were used to analyze the load dependence and size effect of the nanohardness and the plastic deformation.
采用原位纳米测试系统对氮离子注入前后的Ti6Al4V合金试样进行纳米压痕实验,研究材料纳米硬度的载荷相关性和尺寸效应,及其在纳米尺度下材料的塑性变形过程。
2) loading rate dependency
载荷速率相关性
1.
The loading rate dependency of rock strength is well related to time dependent properties of rocks.
岩石强度的载荷速率相关性与岩石的时间相关性特性及粘弹性性质密切相关,而且强度的载荷速率相关性越大,越容易发生蠕变破坏。
3) load-dependent
载荷相关
1.
Based on modified Prandtl-Ishlinskii(PI)model,the load-dependent hysteresis nonlinearity model was obtained by establishment of relationship between the weight vector of modified PI model and the load value,w.
本文提出一种在低频输入信号下,在一定载荷范围内,超磁致伸缩作动器的载荷相关迟滞非线性建模方法。
4) topology-dependent load
拓扑相关荷载
5) time-dependent load
时间相关载荷
6) Load-Response-Correlation method
荷载响应相关法
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条