1) main runner
主沟
1.
The two 1080-m3 blast furnaces in the Ironworks successively went into operation at the end of 2005,the frontside main runner being of semi-pouring,semi-ramming mix.
莱钢炼铁厂银山前区2×1080m3高炉于2005年底相继投产,炉前主沟为半浇注、半捣打料混合主沟。
2.
In order to meet the requirement of high strength smelting,the sand hole of 700 m3 BF main runner is modified.
为了适应高强度冶炼的需要,对700m3高炉主沟砂口进行了改进。
2) main trough
主沟
1.
Damage causes of main trough of BF are analyzed by manufacturing and maintenance of main trough .
通过主沟的砸制与维护实践,分析主沟损坏的原因,探讨适合南钢高炉主沟制作、使用的思路,为高炉强化冶炼提供良好的外围环境。
2.
In order to increase the hot metal throughput of main trough, some reforms to the trough were carried out, and in order to realize zero-interval tapping and meet the needs for smooth operation and intensified smelting of BF, the management and maintenance of taphole were strengthened at Maanshan Steel's 2500 m~3 BF.
马钢2500m~3高炉通过对渣铁沟进行技术改造,增加了主沟通铁量;通过加强铁口管理与维护,实现了零间隔出铁,满足了高炉强化冶炼的需要。
3) communication themes
沟通主题
4) communicant
[英][kə'mju:nɪkənt] [美][kə'mjunɪkənt]
沟通主体
1.
Performance communication is the key in performance management, it plays an important role in every process of the whole performance management, but the communicants is different from processes, it is necessary a effective and lasting communication to communicants.
绩效沟通是绩效管理的关键,在绩效管理的每个环节中都发挥着重要作用,而绩效沟通的主体在每个环节中是不同的,沟通主体之间要有持续有效的沟通。
6) main ditch
主排水沟
补充资料:沟主
1.方言。官吏。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条