1) top pressure
顶压
1.
Based on field tests,an adaptability reform of the program for BF top pressure control in TRT system was carried out,making the operation of the unit meet the actual production.
从TRT(高炉煤气余压透平发电装置)生产过程中发现的问题出发,结合当前莱钢生产实际,提出了应用解决方案,并在现场试验的基础上,对银前TRT机组的高炉顶压控制程序进行了适应性改造,使机组的运行满足了生产实际。
2.
Under the field tests,this text explained that how to redevelop the program of blast furnace top pressure control in TRT system.
本文从 TRT(高炉煤气余压透半发电装置)生产过程中发现的问题出发,结合当前莱钢生产实际,提出了应用解决方案,并在现场试验的基础上,对银前 TRT 机组的高炉顶压控制程序进行了适应性改造,使机组的运行满足了生产实际。
3.
Those devices as follows:top pressure,PCI ratio,oxygen enrichment ect.
3号高炉主要采取有:精料,提高风温、顶压、煤比、富氧,探索控制适宜的炉缸理论燃烧温度,优化上下部操作等一系列措施,使技术经济指标节节攀升。
2) coping
[英]['kəʊpɪŋ] [美]['kopɪŋ]
顶盖;压顶
3) roof pressure
顶板压力
1.
Study on the blind number recognition of the calculation of roof pressure;
顶板压力计算的盲数辨识研究
2.
Effect of igneous rock on the roof pressure of mining field;
火成岩对采场顶板压力分布的影响
3.
By a long-term effective observation and analysis of roof pressure at thick seam caving face such as observing by installing 11 YZJ-60-disc pressure instruments,preliminarily several very important regularity of the pressure curv at fully mechanized actual mining are got,which provides a useful guide for the actuat mining.
通过对厚煤层综采放顶煤工作面顶板压力进行长期有效的观测与分析,在工作面支架上安装11台YZJ-60型圆盘测压仪进行观测,初步得出了综采工作面回采几个重要的压力显现规律曲线,为工作面的回采提供了有益的指导。
4) pressure from the top
大顶来压
1.
Basing on the two practical examples,we regard that the running water of the working surface has close relationships withmany factors,such as the pressure from the top,thickness of the water-resistantplate,breaking of the bottom plate and so on.
文章根据两个实例的研究认为:工作面的突水与大顶来压,隔水层厚度,底板破碎情况等因素都有密切的关系。
5) top coal fracture
顶煤压裂
1.
The author systematically studies change law of the damage variation D on top coal fracture with Mining depth H,coal strenth R c and seam thickness by elastic plastics coupling finiteelement numerical value analysis with cross test.
运用弹塑性耦合有限元数值分析正交试验法 ,系统研究了放顶煤开采中顶煤压裂的损伤变量 D随开采深度 H,煤的强度 Rc 和煤层厚度的变化规律 ,得出开采深度和煤的强度是影响顶煤损伤参数的主要因素 ,煤层厚度等因素影响是微弱
6) top pressure of blast furnace
高炉顶压
1.
To solve the problem of the stability of the top pressure of blast furnace, a fuzzy-PID control system is designed.
针对高炉炉顶压力稳定是TRT系统正常运行的前提条件,设计了TRT系统高炉顶压的模糊PID控制方案,取得了较好的控制效果。
补充资料:庑殿顶
古建筑屋顶形式之一,亦称四阿顶、五脊殿。由1条正脊和4条斜脊组成四面坡,有单檐、重檐之别。重檐庑殿顶为屋顶最高等级形式。