1)  linking
合茬
1.
The uninterrupted transmission plugging and linking technology applied in the workshop outside nitrogen gas and argon gas pipelines arrangement routine changing project in Laiwu Steel Yinshan Section Company and the construction management procedures and construction process adopted in the technology are introduced.
简述了莱钢银山型钢公司外部氮氩管道改线工程应用的不停输封堵合茬技术以及不停输封堵技术所采用的施工管理程序和施工工艺。
补充资料:合符
1.符信相合;合验符信。古代以竹木或金石为符,上书文字,剖而为二,各执其一,合之为证。 2.相符合。 3.指符信。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。