1) construction
[英][kən'strʌkʃn] [美][kən'strʌkʃən]
施工
1.
The application of overall safety management in the construction of bridge;
全面安全管理在桥梁施工中的应用
2.
Drawing Up a Completed Project Technical File in Construction Stage of Chemical Industry Construction Item;
化工建设项目施工阶段交工技术文件编制
3.
Questions existed in construction of building fire protection facilities and countermeasures;
浅谈建筑消防设施施工存在的问题及举措
2) construct
[英][kən'strʌkt] [美][kən'strʌkt]
施工
1.
Brief Analysis on the Smooth-traffic Project during the Reconstruction of Old Roads;
浅析老路改造施工期间的保畅工程
2.
Importance of management for OPGW constructing process;
从一次OPGW的施工故障看施工过程管理的重要意义
3.
The Organization and Management of the Construction in Preparatory Stage;
施工准备阶段的组织管理
3) application
[英][,æplɪ'keɪʃn] [美]['æplə'keʃən]
施工
1.
The application of construction machine in the rural roads;
浅谈农村公路施工机械的使用
2.
Study and application of a glaze-surface putty of quick dry at room temperature;
常温快干釉面腻子的研制与施工
3.
Preparation and application of granite imitation paints
仿花岗岩真石漆的制备及施工
4) operation
[英][,ɔpə'reɪʃn] [美]['ɑpə'reʃən]
施工
1.
Fracturing sand control plan and matters often neglected in operation process and solution method;
压裂防砂技术设计和施工过程中常忽略的几个问题及解决方法
2.
Bus Interior Trim Design and Operation;
现代客车内装饰设计与施工
3.
Several problems of designing and operation for pretension concrete piles;
预应力管桩设计与施工的几个问题
5) installation
[英][,ɪnstə'leɪʃn] [美]['ɪnstə'leʃən]
施工
1.
Solutions of several problems in design and installations of pressurized long pipe system
有压长管系统设计施工中问题的解决
2.
In this paper,the structure of steam superheater (A BA701) lining,its installation method and points for attention during installation are introduced in detail.
本文详细地介绍了某厂蒸汽过热器 ( A— BA70 1 )衬里的结构、施工方法及施工中的注意事项 ,对结构相同或相似衬里的施工有着指导意义 。
3.
The author of this paper presents some proposals about the production and appropriate lay-out in installation of large size ACSR.
大截面钢芯铝绞线在生产上并不复杂,但从各大电网公司输变电施工等部门反馈的信息来看,产品仍有诸多的缺陷。
6) engineering
[英][,endʒɪ'nɪərɪŋ] [美]['ɛndʒə'nɪrɪŋ]
施工
1.
On exploration of architectural engineering management
关于建设施工项目管理的探讨
2.
Combined with present domestic situation of slope ecological preventing,the paper introduces and explores its adaptability,principles of choosing plants,types and engineering methods of slope prevention.
采用生态防护边坡将是我国今后边坡防护的一种发展趋势,本文结合国内目前边坡生态防护情况,介绍和探讨边坡生态防护的适宜性、植物选择的原则、边坡防护施工的类型与施工方法。
3.
The reasonably optimized organization and controlling for its drilling engineering may improve the engeering quslitiy,ensure the engineering safety,and bring its advantages into full play.
BG系列旋挖钻机具有成孔速度快、工程质量好、环境污染小等优点,通过合理优化的施工组织控制可以提升旋挖钻机的施工质量,保障施工安全,更加充分地发挥旋挖钻机施工的优势。
补充资料:施工
施工
construction
shlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段. 核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。 施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备. 施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。 施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。 施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条